About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

13

Projects

Seti Khola

Kaski

  • Seti- II Small Hydropower Project
  • Seti Khola Hydropower Project
  • Seti Hydropower Project
  • Setikhola Hydroelectric Project
  • Tanahu Hydroelectric Project
  • Super Seti HEP
  • Bajhang Upper Seti HEP
  • Phewa Hydropower Project
  • Upper Seti-1 HEP
  • Supreme Middle Seti HEP
  • Karuwa Seti HEP
  • Seti Khola HPP
  • Setikhola Hydroelectric Project
mai khola

11

Projects

Mai Khola

Ilam,Mahottari,Sindhuli

  • Mai Khola Hydropower Project
  • Mai Hydropower Project
  • Mai Cascade Hydropower Station
  • Upper Mai C Hydroelectric Project
  • Mai Cascade Hydropower Project
  • Upper Mai Hydroelectric Project
  • Mai Beni Hydropower Project
  • Super Mai Hydropower Project
  • Mai Third HPP
  • Super Mai Khola Cascade Hydropower Project
  • Super Mai-A Hydropower Project
mai khola

10

Projects

Trishuli River

Chitwan,Dhading,Gorkha,Makawanpur,Nuwakot,Rasuwa,Tanahu

  • Super Trishuli Hydropower Project
  • Trishuli Hydropower Station
  • Upper Trishuli 3B Hydropower Project
  • Upper Trishuli-1 Hydropower Project
  • Upper Trishuli-2 Hydropower Project
  • Upper Trishuli Khola HPP
  • Devighat Hydropower Station
  • Upper Trishuli 3A Hydropower Project
  • Middle Trishuli Ganga Nadi Hydropower Project
  • Trishuli Galchhi Hydropower Project
mai khola

10

Projects

Tamor River

Dhankuta,Panchthar,Sindhuli,Taplejung,Terhathum

  • Middle Tamor Hydropower Project
  • Upper Tamor Hydropower Project
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Ghunsa-Tamor HEP
  • Tamor Mewa Hydropower Project
mai khola

9

Projects

Modi Khola

Kaski,Parbat

  • Upper Modi A Hydropower Project
  • Upper Modi Hydropower Cascade Project
  • Modikhola Hydropower Station
  • Lower Modi 1 Hydropower Project
  • Lower Modi Khola Hydropower Project
  • Middle Modi
  • Lower Modi-II Cascade Hydropower Project
  • Machhapuchhre Modi HEP
  • Landruk Modi HEP
mai khola

8

Projects

Hewa Khola

Panchthar,Sankhuwasabha

  • Hewa A Small Hydroelectric Project
  • Hewa Khola Small Hydropower Project
  • Hewa Khola A Hydropower Project
  • Upper Hewa Hydropower Project
  • Super Hewa Hydropower Project
  • Hewa Khola (Chainpur) HEP
  • Lower Hewa Hydropower Project
  • Lower Hewa Khola-A HPP
mai khola

8

Projects

Kali Gandaki River

Baglung,Chitwan,Gulmi,Mustang,Myagdi,Nawalparasi_E,Palpa,Parbat,Syangja,Tanahu

  • Tanchhahara Small Hydropower Project
  • Gulandi Khola Small Hydropower
  • Kaligandaki A Hydropower Station
  • Kaligandaki Gorge Hydropower Project
  • Middle Kaligandaki Hydropower Project
  • Tiplyang Kaligandaki HEP
  • Kali Gandaki-Kowan Hydropower Project
  • Kaligandaki Upper Hydropower Project
mai khola

8

Projects

Marsyangdi River

Baglung,Chitwan,Gorkha,Lamjung,Manang,Palpa,Tanahu

  • Upper Marsyangdi- 2 Hydropower Project
  • Upper Marsyangdi 1 Hydropower Project
  • Marsyangdi Besi Hydropower Project
  • Lower Manang Marsyangdi Hydropower Project
  • Manang Marsyangdi Hydropower Project
  • Marsyangdi Hydropower Station
  • Middle Marsyangdi Hydropower Station
  • Upper Marsyangdi A
mai khola

8

Projects

Likhu Khola

Nuwakot

  • Likhu -1 Hydropower Project
  • Likhu -2 Hydropower Project
  • Likhu Khola 'A' Hydropower Project
  • Likhu 4 A Cascade Hydroelectric Project
  • Middle Likhu Small Hydroelectric Project
  • Likhu-4 Hydropower Project
  • Lower Likhu Hydropower Project
  • Likhu Khola Hydropower Project
mai khola

8

Projects

Kabeli Khola

Panchthar,Taplejung

  • Super Kabeli Khola HPP
  • Upper Kabeli HPP
  • Upper Kabeli-2 HPP
  • Super Kabeli Khola A
  • Kabeli-3 HEP
  • Kabeli B - 1 Hydropower Project
  • Kabeli-A Hydropower Project
  • Kabeli B1 Cascade HPP
mai khola

7

Projects

Bhotekoshi River

Sindhupalchok,Solukhumbu

  • Madhya Bhotekoshi Hydropower Project
  • Rasuwa Bhotekoshi Hydropower Project
  • Rasuwagadhi Hydropower Project
  • Upper Bhotekoshi Hydroelectric Project
  • Botekoshi 5 HEP
  • Bhotekoshi Khola HEP
  • Bhotekoshi V HEP
mai khola

7

Projects

Madi Khola

Baglung,Bajura,Pyuthan,Rolpa

  • Namarjun Madi Hydropower Project
  • Madi-Bhorletar Hydropower Project
  • Super Madi Hydropower Project
  • Madi Storage Hydroelectric Project
  • Upper Madi Hydropower Project
  • Bajra Madi Hydropower Project
  • Gapuche Madi Nadi HEP

Hydropower Projects

mai khola

Upper Chaku A Hydropower Project

Marbin,Fulpingkatti (Sindhupalchok)

Chaku Khola lies in the frontier of Phulpingkatti VDC and Marming VDC. The Project area lies along the middle reach of Chaku Khola of Sindhupalchowk district of Bagmati zone in the Central Development Region of Nepal. Geographically, the project area is located in between the longitudes 85º58’06”E and latitude 27º51’32”N (at Headworks site) and 85º55’47”E and 27º 52’31”N (at Powerhouse site). Physiographically, the project area belongs to the middle mountains and lies in between 1300m to 2200m above mean sea level.
  • Issue Date: 2012-02-24
  • Installed Capacity : 22.2 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Likhu-4 Hydropower Project

Ragani,Pokli (Okhaldhunga) Saibu,Bijulikot,Naga Daha,Tilpung (Ramechhap)

  • Issue Date: 2012-03-11
  • Installed Capacity : 52.4 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Lower Khare Hydropower Project

Bulung,Chankhu,Khare,Suriti (Dolakha)

The project has an installed capacity of 11 MW at Q40 with design discharge of 10.1 m3/s and gross head of 140.5m.The project is located at Suri, Chankhu and Khare VDCs of Dolakha District which is about 175 km east from Kathmandu. The Generation license has been received from Department of Electricity Development of under Ministry of Energy for 11 MW Capacity. The Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA) has been conducted for 11 MW has also been signed. The Initial Environmental Examination (IEE) and Supplementary IEE for 11 MW have been approved by Government of Nepal.
  • Issue Date: 2012-07-03
  • Installed Capacity : 11 MW
  • Phase : Under Construction
mai khola

Midim Khola Micro Hydro Project

Isaneshwor (Lamjung)

  • Issue Date: 2012-07-29
  • Installed Capacity : 0.1 MW
  • Phase : Under Construction
mai khola

Upper Sanjen Hydropower Project

Chilime (Rasuwa)

The upper scheme, Sanjen (Upper) Hydroelectric Project (SUHEP), will have an installed capacity of 14.8 MW at a gross head of 161 m and annual energy generation of 82 GWh. The design discharge of the project is 11 m3/sec.
  • Issue Date: 2012-08-23
  • Installed Capacity : 14.8 MW
  • Phase : Under Construction
mai khola

Kabeli-A Hydropower Project

Ambarpur,Panchami (Panchthar) Thechambu (Taplejung)

Kabeli-A Hydroelectric Project (KAHEP) is located in Panchthar and Taplejung districts of Province 1. The project is Peaking Run-Of-River (PROR) type project with a peaking reservoir constructed by damming Kabeli River at headworks. The water from the reservoir will be diverted through a 4.5 km long tunnel into a Powerhouse located on the left bank of Tamor River generating 37.6 MW. The generated power will be evacuated through 132kV Kabeli Corridor Transmission line from the switchyard located at Powerhouse site of the project. In the equity part of total capitalized cost of the project, majority of equity is held by Butwal Power Company Ltd. BPC owns 55.6% equity shares in Kabeli Energy Limited (KEL) with 26% direct holding and the remaining through Gurans Energy Limited, a JV investment company. In the debt part US$ 78.6 million will be available from WB and IFC. Loan Agreement between GoN and WB was signed and US$ 40 million loan available from WB is being channelized to Kabeli-A project through Hydropower Investment and Development Company Ltd (HIDCL). US$ 38.6 million of loan will be provided by International Finance Corporation (IFC). 24 km of access road to the project sites have been constructed and upgraded by the project. Access tunnel excavation work has been completed and main tunnel excavation has been started from headworks site and completed for around 1000 m. Temporary Contractor camps and facilities at headworks and power house sites have been also been completed. Due to the lack of progress and non-compliances issues of the Contractor, the contract has been terminated and project construction activities at site are on hold now. Recovery plan has been formulated and is being implemented.
  • Issue Date: 2012-09-06
  • Installed Capacity : 37.6 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Rasuwagadhi Hydropower Project

Thuman,Timure (Rasuwa)

Rasuwagadhi Hydroelectric Project (RGHEP) having capacity of 111MW in Rasuwa district of Central Development Region. The cost of the project is estimated to be NRs. 13,684.20 million excluding financial cost. A 50:50 debt-equity structure will be employed for financing this project.
  • Issue Date: 2012-12-06
  • Installed Capacity : 111 MW
  • Phase : Under Construction
mai khola

Upper Khimti Hydropower Project

Chuchure (Ramechhap)

  • Issue Date: 2012-12-18
  • Installed Capacity : 12 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Namarjun Madi Hydropower Project

Namarjung,Sildujure (Kaski)

  • Issue Date: 2012-12-26
  • Installed Capacity : 12 MW
  • Phase : Under Construction
mai khola

Upper Mailun Khola Hydropower Project

,Gatlang,Haku,Dandagoun (Rasuwa)

  • Issue Date: 2013-04-01
  • Installed Capacity : 14.3 MW
  • Phase : Under Construction
mai khola

Junbeshi Hydropower Project

Beni (Solukhumbu)

  • Issue Date: 2013-01-04
  • Installed Capacity : 5.2 MW
  • Phase : Under Construction
mai khola

Dordi-1 Hydropower Project

Chiti,Bansar,Dhodeni,Faleni (Lamjung)

The project is located in Dordi Gaupalika-6, Lamjung. Its registered office is located at Kathmandu -11, Bluestar Complex, Tripureshor.
  • Issue Date: 2013-01-25
  • Installed Capacity : 12 MW
  • Phase : Under Construction