dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

2

Projects

Chauri Khola

Kabhrepalanchok,Okhaldhunga,Ramechhap,Rukum_W,Sindhupalchok,Solukhumbu

  • Chauri Khola Hydropower Project
  • Upper Chauri Khola Hydropower Project
mai khola

2

Projects

Phalakhu Khola

Nuwakot,Rasuwa

  • Phalakhu Khola Hydropower Project
  • Phalakhu Khola Hydropower Project
mai khola

2

Projects

Chirkhuwa Khola

Bhojpur,Sankhuwasabha

  • Upper Chirkuwa Khola Hydropower Project
  • Lower Chirkhuwa Hydropower Project
mai khola

2

Projects

Tara Khola

Baglung,Pyuthan

  • Tara Khola Community (Mini) Hydropower Project
  • Middle Tara Khola Small Hydropower Project
mai khola

2

Projects

Nilgiri Khola

Myagdi

  • Nilgiri Khola Hydropower Project
  • Nilgiri Khola-II cascade Project
mai khola

2

Projects

Buku Khola

Dailekh,Okhaldhunga,Solukhumbu

  • Buku-Kapati Hydropower Project
  • Buku Khola Hydropower Project
mai khola

2

Projects

Richet Khola

Gorkha

  • Richet Khola Small Hydropower Project
  • Upper Richet Khola Small Hydropower Project
mai khola

2

Projects

Nwa Gad

Darchula

  • Nwa Gad Hydropower Project
  • Lower Nwagad Small Hydropower Project
mai khola

2

Projects

Belkhu Khola

Dhading,Makawanpur

  • Belkhu Khola Hydropower Project
  • Upper Belkhu Small Hydropower Project
mai khola

2

Projects

Tila Khola

Rukum_E

  • Tila-1 Hydropower Project
  • Tila-2 Hydropower Project
mai khola

2

Projects

Hadi Khola

Gorkha,Kabhrepalanchok,Kaski,Khotang,Lamjung,Sindhuli,Sindhupalchok,Solukhumbu,Syangja,Tanahu,Udayapur

  • Upper Hadi Khola Hydropower Project
  • Hadi Khola (Sunkoshi) A Hydropower Project
mai khola

2

Projects

Jeuli Gad

Bajhang

  • Jeuli Gad Hydropower Project
  • Jeuli-Gad Cascade Hydroelectric Project

Hydropower Projects

mai khola

Mugu Khola HEP

Kimari,Dolphu,Mugu,Pulu (Mugu)

  • Issue Date: 2019-01-21
  • Installed Capacity : 57 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Chuwa Khola HEP

Bargaun,Kharpunath,Thechaya (Humla)

  • Issue Date: 2019-01-18
  • Installed Capacity : 70 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Tarap Khola HEP

Mukot,Lawan (Dolpa)

  • Issue Date: 2018-12-25
  • Installed Capacity : 50 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Bhotekoshi Khola HEP

Chilime,Briddhim,Goljung (Rasuwa)

  • Issue Date: 2018-05-24
  • Installed Capacity : 33.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ikhuwa Khola HEP

Pathibhara,Pawakhola (Sankhuwasabha)

  • Issue Date: 2018-04-20
  • Installed Capacity : 30 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Upper Barunkhola HEP

Makalu (Sankhuwasabha)

  • Issue Date: 2018-04-08
  • Installed Capacity : 55 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Chunchet Syar Khola HEP

Sirdibas,Chunchet,Bihi (Gorkha)

  • Issue Date: 2018-04-18
  • Installed Capacity : 60 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Karuwa Seti HEP

Machhapuchchhre,Sardikhola (Kaski)

  • Issue Date: 2018-04-08
  • Installed Capacity : 32 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Tom Dogar HEP ( Budhi gandaki)

Bihi (Gorkha)

  • Issue Date: 2018-02-25
  • Installed Capacity : 43.52 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Dudhkoshi V HEP

Ravi Bhawan, Kathmandu

  • Application Date: 2020-09-20
  • Installed Capacity : 102 MW
  • Phase : Application for Survey License
mai khola

Manaslu HEP

kathmandu-16, Kathmandu

  • Application Date: 2020-08-31
  • Installed Capacity : 19 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Sangu Khola

Kalingchok, Khupachagu (Dolakha)

  • Issue Date: 2020-01-15
  • Installed Capacity : 5 MW
  • Phase : Under Construction
  • Type : Run-of-River