dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

0

Projects

Gongar Khola

Dolakha

mai khola

0

Projects

Pelma Khola

Rukum_E

mai khola

0

Projects

Seti Khola

Banke,Ilam,Kailali,Makawanpur,Okhaldhunga,Ramechhap,Salyan

mai khola

0

Projects

Shikharjung Khola

Dolakha

mai khola

0

Projects

Miwaie Khola

Kaski

mai khola

0

Projects

Indrawati Nadi

Kabhrepalanchok,Sindhupalchok

mai khola

0

Projects

Hawa Khola

Dolakha,Ramechhap

mai khola

0

Projects

Hongu Khola

Solukhumbu

mai khola

0

Projects

Nupche Khola

Ramechhap

mai khola

0

Projects

Soti Khola

Dailekh,Gorkha,Ilam,Lamjung,Manang

mai khola

0

Projects

Adhi Khola

Myagdi,Parbat,Syangja

mai khola

0

Projects

Nalsyagu Khola

Jajarkot

Hydropower Projects

mai khola

Nupche Likhu HEP

Gumdel (Ramechhap)

  • Issue Date: 2020-01-26
  • Phase : Under Construction
mai khola

Phedi Khola (Thumlung) Small HPP

Dobhane (Bhojpur)

  • Application Date: 2020-02-26
  • Installed Capacity : 3.520 MW
  • Phase : Under Construction
mai khola

Bhotekoshi V HEP

Ramche, Tekanpur, Gati, Barhabise, Maneswor, Mankha (Sindhupalchok)

  • Issue Date: 2020-06-19
  • Installed Capacity : 62 MW
  • Phase : Under Construction
mai khola

Hidi Khola HEP

Bhulbhule, Bahundada (Lamjung)

  • Application Date: 2020-07-29
  • Phase : Under Construction