34

note

Application for Survey License Projects

29

note

Application for Generation License Projects

208

note

Under Construction Hydropower Projects

94

note

Live Hydropower Projects

289

note

No. of Rivers with Hydropower Projects

dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

13

Projects

Seti Khola

Kaski

  • Seti- II Small Hydropower Project
  • Seti Khola Hydropower Project
  • Seti Hydropower Project
  • Setikhola Hydroelectric Project
  • Setikhola Hydroelectric Project
  • Tanahu Hydroelectric Project
  • Seti Khola HPP
  • Super Seti HEP
  • Bajhang Upper Seti HEP
  • Karuwa Seti HEP
  • Phewa Hydropower Project
  • Upper Seti-1 HEP
  • Supreme Middle Seti HEP
mai khola

11

Projects

Mai Khola

Ilam,Mahottari,Sindhuli

  • Mai Khola Hydropower Project
  • Mai Hydropower Project
  • Mai Cascade Hydropower Station
  • Upper Mai C Hydroelectric Project
  • Mai Cascade Hydropower Project
  • Upper Mai Hydroelectric Project
  • Super Mai-A Hydropower Project
  • Mai Beni Hydropower Project
  • Super Mai Khola Cascade Hydropower Project
  • Super Mai Hydropower Project
  • Mai Third HPP
mai khola

10

Projects

Trishuli River

Chitwan,Dhading,Gorkha,Makawanpur,Nuwakot,Rasuwa,Tanahu

  • Middle Trishuli Ganga Nadi Hydropower Project
  • Upper Trishuli 3A Hydropower Project
  • Super Trishuli Hydropower Project
  • Devighat Hydropower Station
  • Trishuli Hydropower Station
  • Upper Trishuli 3B Hydropower Project
  • Trishuli Galchhi Hydropower Project
  • Upper Trishuli-1 Hydropower Project
  • Upper Trishuli-2 Hydropower Project
  • Upper Trishuli Khola HPP
mai khola

10

Projects

Tamor River

Dhankuta,Panchthar,Sindhuli,Taplejung,Terhathum

  • Tamor Mewa Hydropower Project
  • Middle Tamor Hydropower Project
  • Upper Tamor Hydropower Project
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Tamor Storage
  • Ghunsa-Tamor HEP
mai khola

9

Projects

Modi Khola

Kaski,Parbat

  • Upper Modi A Hydropower Project
  • Upper Modi Hydropower Cascade Project
  • Modikhola Hydropower Station
  • Lower Modi 1 Hydropower Project
  • Lower Modi Khola Hydropower Project
  • Middle Modi
  • Lower Modi-II Cascade Hydropower Project
  • Landruk Modi HEP
  • Machhapuchhre Modi HEP
mai khola

8

Projects

Hewa Khola

Panchthar,Sankhuwasabha

  • Hewa A Small Hydroelectric Project
  • Hewa Khola Small Hydropower Project
  • Hewa Khola A Hydropower Project
  • Lower Hewa Hydropower Project
  • Upper Hewa Hydropower Project
  • Super Hewa Hydropower Project
  • Lower Hewa Khola-A HPP
  • Hewa Khola (Chainpur) HEP
mai khola

8

Projects

Kali Gandaki River

Baglung,Chitwan,Gulmi,Mustang,Myagdi,Nawalparasi_E,Palpa,Parbat,Syangja,Tanahu

  • Tanchhahara Small Hydropower Project
  • Kali Gandaki-Kowan Hydropower Project
  • Gulandi Khola Small Hydropower
  • Kaligandaki A Hydropower Station
  • Kaligandaki Upper Hydropower Project
  • Kaligandaki Gorge Hydropower Project
  • Middle Kaligandaki Hydropower Project
  • Tiplyang Kaligandaki HEP
mai khola

8

Projects

Marsyangdi River

Baglung,Chitwan,Gorkha,Lamjung,Manang,Palpa,Tanahu

  • Upper Marsyangdi- 2 Hydropower Project
  • Upper Marsyangdi 1 Hydropower Project
  • Marsyangdi Besi Hydropower Project
  • Lower Manang Marsyangdi Hydropower Project
  • Manang Marsyangdi Hydropower Project
  • Marsyangdi Hydropower Station
  • Middle Marsyangdi Hydropower Station
  • Upper Marsyangdi A
mai khola

8

Projects

Likhu Khola

Nuwakot

  • Likhu -1 Hydropower Project
  • Likhu -2 Hydropower Project
  • Likhu Khola 'A' Hydropower Project
  • Likhu 4 A Cascade Hydroelectric Project
  • Middle Likhu Small Hydroelectric Project
  • Likhu-4 Hydropower Project
  • Lower Likhu Hydropower Project
  • Likhu Khola Hydropower Project
mai khola

8

Projects

Kabeli Khola

Panchthar,Taplejung

  • Kabeli B - 1 Hydropower Project
  • Kabeli-A Hydropower Project
  • Super Kabeli Khola HPP
  • Kabeli B1 Cascade HPP
  • Upper Kabeli HPP
  • Upper Kabeli-2 HPP
  • Super Kabeli Khola A
  • Kabeli-3 HEP
mai khola

7

Projects

Madi Khola

Baglung,Bajura,Pyuthan,Rolpa

  • Namarjun Madi Hydropower Project
  • Madi-Bhorletar Hydropower Project
  • Super Madi Hydropower Project
  • Madi Storage Hydroelectric Project
  • Upper Madi Hydropower Project
  • Bajra Madi Hydropower Project
  • Gapuche Madi Nadi HEP
mai khola

7

Projects

Piluwa Khola

Sankhuwasabha

  • Lower Piluwa Hydropower Project
  • Down Piluwa Hydropower Project
  • Upper Piluwa Khola-2 Small Hydropower Project
  • Upper Piluwa Hills Small Hydropower Project
  • Piluwa Khola Small Hydropower Project
  • Upper Piluwa-1
  • Upper Piluwa 3 HPP

Hydropower Projects

mai khola

Daram khola A Hydroelectric Project

baglung

Daram Khola Hydropower Project in Hila and Argal VDC of Baglung district. This is a run-off-river scheme, with the design discharge 3.6 m3/s and 91.34m gross head that will generate 2.5 Mw of electric energy. The project consists of headworks with a weir across the river to divert flow, headrace with penstock pipe as a water conveyance system, and surface powerhouse on the left bank of Daram Khola. The project site is located about 35km i.e. (20km gravel and 15km earthen road to be upgraded) from Baglung bazaar to Ghusmeli village. The weir site of Project is located in Hila and Argal VDC and powerhouse is located in Argal VDC
  • Commercial Operation Date : 2016-06-26
  • Installed Capacity : 2.5 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Upper Puwa-1 Hydropower Project

Illam

  • Commercial Operation Date : 2015-01-15
  • Installed Capacity : 3 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Sardikhola Hydropower Project

Kaski

  • Commercial Operation Date : 2017-12-09
  • Installed Capacity : 4 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Upper Mai C Hydroelectric Project

Illam

  • Commercial Operation Date : 2017-07-24
  • Installed Capacity : 6.1 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Mai Cascade Hydropower Project

Illam

  • Commercial Operation Date : 2018-04-09
  • Installed Capacity : 8 MW
  • Phase : Live
  • Type : Run-of-River, Cascade
mai khola

Puwa Khola-1 Small Hydropower Plant

Illam

The 4-MW Puwa Khola 1 small hydropower plant on the Puwa Khola River located near the towns of Shanti Danda and Barbote in the Eastern Development Region of Nepal. The US$11 million project financed in part by Sidhhartha Bank and Citizen Bank, and licensed by Nepal Electricity Authority (NEA), was developed by Puwa Khola 1 Hydropower Private Ltd.
  • Commercial Operation Date : 2017-10-09
  • Installed Capacity : 4 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Madkyu Khola Hydropower Project

Kaski

  • Commercial Operation Date : 2018-03-23
  • Installed Capacity : 13 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Chake Khola Hydroelectric Project

Ramechhap

  • Commercial Operation Date : 2017-12-14
  • Installed Capacity : 2.83 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Dwari Khola Small Hydropower Project

Dailekh

Dwari Khola Small Hydropower Project, developed by Bhugol Energy Development Co. (BEDC) is located at Naumule in Dailekh District in the Mid-Western Development Region of Nepal. The headworks are 3 km upstream of the confluence of the Dwari Khola and Lohore Khola, with the powerhouse 300 meters downstream from the confluence.
  • Commercial Operation Date : 2017-05-06
  • Installed Capacity : 3.75 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Pati Khola Hydropower Project

Parbat

  • Commercial Operation Date : 2009-02-09
  • Installed Capacity : 0.996 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Belkhu Khola Hydropower Project

Dhading

  • Commercial Operation Date : 2015-04-13
  • Installed Capacity : 0.518 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Upper Hadi Khola Hydropower Project

Kathmandu

  • Commercial Operation Date : 2009-11-08
  • Installed Capacity : 0.990 MW
  • Phase : Live
  • Type : Run-of-River