34

note

Application for Survey License Projects

29

note

Application for Generation License Projects

208

note

Under Construction Hydropower Projects

94

note

Live Hydropower Projects

289

note

No. of Rivers with Hydropower Projects

dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

4

Projects

Dudhkoshi River

Khotang,Okhaldhunga,Solukhumbu,Sunsari,Udayapur

  • Dudhkoshi-2 (Jaleswar) Hydropower Project
  • Dudhkoshi Storage Hydroelectric Project
  • Dudhkoshi Storage HEP
  • Dudhkoshi-6 HEP
mai khola

4

Projects

Budhi Gandaki River

Dhading,Gorkha

  • Budhigandaki Ka Hydropower Project
  • Budhi Gandaki HEP
  • Tom Dogar HEP ( Budhi gandaki)
  • Budhigandaki Ka Hydroelectric Project
mai khola

4

Projects

Chepe Khola

Gorkha,Ilam,Lamjung,Tanahu

  • Super Chepe HEP
  • Dudhpokhari Chepe HEP
  • Chepe Khola Small HEP
  • Chepe Khola HEP
mai khola

4

Projects

Hongu Khola

Solukhumbu

  • Middle Hongu Khola B HPP
  • Middle Hongukhola A Hydropower Project
  • Hongu Khola I HEP
  • Hongu Khola HEP
mai khola

4

Projects

Dudh Khola

Baglung,Lamjung,Manang,Myagdi

  • Dudh Khola Dordi HEP
  • Lower Dudkunda HPP
  • Dudh Khola Small HPP
  • Dudh khola HEP
mai khola

3

Projects

Sunkoshi Nadi

Bhojpur,Dhankuta,Kabhrepalanchok,Khotang,Okhaldhunga,Ramechhap,Sindhuli,Sindhupalchok,Udayapur

  • Middle Sunkoshi Hydropower Project
  • Sunkoshi Hydropower Station
  • Sunkoshi Small Hydropower Project
mai khola

3

Projects

Chamaliya Nadi

Baitadi,Darchula

  • Chameliya (Chhetigad) Hydropower Project
  • Upper Chameliya Hydropower Project
  • Chameliya Khola Hydropower Project
mai khola

3

Projects

Daram Khola

Baglung,Gulmi

  • Daram khola A Hydroelectric Project
  • Daram Khola Hydroelectric Project
  • Middle Daram Khola-B Hydropower Project
mai khola

3

Projects

Jogmai Khola

Ilam

  • Jogmai Khola Small Hydroelectric Project
  • Lower jogmai Khola
  • Jogmai Cascade
mai khola

3

Projects

Kulekhani Khola

Makawanpur

  • Kulekhani 3 Hydropower Project
  • Kulekhani II Hydropower Station
  • Kulekhani 1 Hydropower Station
mai khola

3

Projects

Bagmati Nadi

Kabhrepalanchok,Kathmandu,Lalitpur,Makawanpur,Rautahat,Sarlahi,Sindhuli

  • Bagmati Nadi Hydropower Project
  • Tallo Bagmati Small HPP
  • Malta Bagmati Small Hydro Power Project
mai khola

3

Projects

Sanjen Khola

Rasuwa

  • Sanjen Khola Hydropower Project
  • Sanjen Hydropower Project
  • Upper Sanjen Hydropower Project

Hydropower Projects

mai khola

Chhandi Khola Hydropower Project

Lamjung, Gandaki

Chhandi Khola Small Hydropower Project is a run-of-river type hydropower scheme aimed with utilizing water discharge from Chhandi & Ghatte Khola, a tributary of Dordi River for power generation. The Project has an installed capacity of 2.0 MW. The project utilizes gross head of about 186.0 m and design discharge of 1.30 m3/s (1.03 m3/s from Chhandi Khola and 0.297 m3/s from Ghatte Khola) to generate an annual average energy of 11.204 GWh.
  • Commercial Operation Date : 2106-03-26
  • Installed Capacity : 2 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Bhairabkund Small Hydropower Project

Sindhupalchok

  • Commercial Operation Date : 2014-05-16
  • Installed Capacity : 3 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Mailung Khola Hydropower Project

Rasuwa

  • Commercial Operation Date : 2014-03-17
  • Installed Capacity : 5 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Molun Khola Small Hydropower Project

Okhaldhunga

  • Commercial Operation Date : 2018-02-24
  • Installed Capacity : 7 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Dhad Khola Small Hydropower Project

Dharampani, Tanahun

  • Issue Date: 2010-03-10
  • Installed Capacity : 2.720 MW
  • Phase : Application for Generation License
  • Type : Run-of-River
mai khola

Super Hewa Hydropower Project

Jaljala,Siddhapokhari (Sankhuwasabha)

  • Issue Date: 2010-08-29
  • Installed Capacity : 5.0 MW
  • Phase : Under Construction
mai khola

Upper Marsyangdi- 2 Hydropower Project

Ghermu,Taghring (Lamjung)

  • Issue Date: 2011-09-12
  • Installed Capacity : 600 MW
  • Phase : Application for Generation License
mai khola

Upper Rahughat Hydropower Project

Chimkhola, Myagdi

  • Issue Date: 2013-06-17
  • Installed Capacity : 48.5 MW
  • Phase : Under Construction
mai khola

Jhyaku Khola Hydropower Project

Jhyaku, Dolakha

  • Issue Date: 2018-09-20
  • Installed Capacity : 5.243 MW
  • Phase : Under Construction
mai khola

Dudhkoshi-2 (Jaleswar) Hydropower Project

Deusa, Solukhumbhu

  • Issue Date: 2018-09-20
  • Installed Capacity : 240 MW
  • Phase : Application for Generation License
mai khola

Upper Trishuli-2 Hydropower Project

Haku, Rasuwa

The proposed Upper Trishuli-2 Hydroelectric project of 102 MW capacity is situated 127 km north of Kathmandu, the capital city of Nepal, on the Trishuli River about 950 m downstream of Chilime Powerhouse (22 MW) in the Rasuwa District of Bagmati zone in the Central Development Region of Nepal. Proposed project is a Run-of-River (RoR) scheme aimed at utilizing the design discharge of 110 m3/s to generate average annual hydro-based electric energy of 593 GWh. The catchment area at the proposed intake site is 4064 km2 and the rated head is 99.6 m.
  • Issue Date: 2018-09-20
  • Installed Capacity : 102.0 MW
  • Phase : Under Construction
mai khola

Middle Trishuli Ganga Nadi Hydropower Project

Gerkhu, Nuwakot

  • Issue Date: 2018-09-20
  • Installed Capacity : 65 MW
  • Phase : Application for Generation License