dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

3

Projects

Junbesi Khola

Solukhumbu

  • Junbeshi Hydropower Project
  • Junbesi Small
  • Upper Junbesi HPP
mai khola

3

Projects

Badigad Khola

Achham,Doti,Gulmi,Syangja

  • Badigad Hydropower Project
  • Badigad (Kolti) Hydropower Project
  • Badigad Khola HEP
mai khola

3

Projects

Ruru Bangchu Khola

Kalikot

  • Ruru Banchu - 1 Hydropower Project
  • Ruru Banchu Khola- 2 Hydropower Project
  • Upper Ruru Banchu Khola HEP
mai khola

3

Projects

Nyasem Khola

Sindhupalchok

  • Upper Nyasim Khola Hydropower Project
  • Upper Nyasem A HEP
  • Nyasim Hydropower Project
mai khola

3

Projects

Lapche Khola

Dolakha

  • Lapche Khola Hydropower Project
  • Upper Lapche Khola Hydropower Power Project
  • Lapche-Tamakoshi HEP
mai khola

3

Projects

Nau Gad

Baitadi,Darchula

  • Nau Gad Khola Hydropower Project
  • Naugad HPP
  • Upper Naugad Hydropower Project
mai khola

3

Projects

Nadi Khola

Bajhang,Lamjung,Palpa

  • Super Nyadi Hydropower Project
  • Nyadi Khola Hydropower Project
  • Nyadi- Phidi Hydropower Project
mai khola

3

Projects

Khorunga Khola

Panchthar,Terhathum

  • Khorunga Khola Hydropower Project
  • Lower Khorunga Hydropower Project
  • Upper Khorunga Hydropower Project
mai khola

3

Projects

Raughat Khola

Myagdi

  • Rahughat Hydropower Project
  • Rahughat Mangale Hydropower Project
  • Upper Rahughat Hydropower Project
mai khola

3

Projects

Thulo Khola

Achham,Baglung,Baitadi,Bajura,Banke,Dadeldhura,Dhading,Dhankuta,Dolakha,Doti,Gulmi,Kabhrepalanchok,Kailali,Kaski,Kathmandu,Lamjung,Makawanpur,Myagdi,Nawalparasi_E,Nuwakot,Okhaldhunga,Parbat,P

  • Thulo Khola HPP
  • Thulo Khola Hydropower Project
  • Lower Thulo Khola Hydropower Project
mai khola

3

Projects

Machha Khola

Gorkha

  • Super Machha Khola HEP
  • Upper Machha Khola HEP
  • Machhe Khola HPP
mai khola

3

Projects

Bhurungdi Khola

Kaski,Myagdi,Parbat

  • Upper Bhurundi Khola SHP
  • Bhurundi Khola Small HEP
  • Upper Bhurundi Khola- A Small HEP

Hydropower Projects

mai khola

Bhairabkund Small Hydropower Project

Sindhupalchok

  • Commercial Operation Date : 2014-05-16
  • Installed Capacity : 3 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Mailung Khola Hydropower Project

Rasuwa

  • Commercial Operation Date : 2014-03-17
  • Installed Capacity : 5 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Molun Khola Small Hydropower Project

Okhaldhunga

  • Commercial Operation Date : 2018-02-24
  • Installed Capacity : 7 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Dhad Khola Small Hydropower Project

Dharampani, Tanahun

  • Issue Date: 2010-03-10
  • Installed Capacity : 2.720 MW
  • Phase : Application for Generation License
  • Type : Run-of-River
mai khola

Super Hewa Hydropower Project

Jaljala,Siddhapokhari (Sankhuwasabha)

  • Issue Date: 2010-08-29
  • Installed Capacity : 5.0 MW
  • Phase : Under Construction
mai khola

Upper Marsyangdi- 2 Hydropower Project

Ghermu,Taghring (Lamjung)

  • Issue Date: 2011-09-12
  • Installed Capacity : 600 MW
  • Phase : Application for Generation License
mai khola

Upper Rahughat Hydropower Project

Chimkhola, Myagdi

  • Issue Date: 2013-06-17
  • Installed Capacity : 48.5 MW
  • Phase : Under Construction
mai khola

Jhyaku Khola Hydropower Project

Jhyaku, Dolakha

  • Issue Date: 2018-09-20
  • Installed Capacity : 5.243 MW
  • Phase : Under Construction
mai khola

Dudhkoshi-2 (Jaleswar) Hydropower Project

Deusa, Solukhumbhu

  • Issue Date: 2018-09-20
  • Installed Capacity : 70 MW
  • Phase : Under Construction
mai khola

Upper Trishuli-2 Hydropower Project

Haku, Rasuwa

The proposed Upper Trishuli-2 Hydroelectric project of 102 MW capacity is situated 127 km north of Kathmandu, the capital city of Nepal, on the Trishuli River about 950 m downstream of Chilime Powerhouse (22 MW) in the Rasuwa District of Bagmati zone in the Central Development Region of Nepal. Proposed project is a Run-of-River (RoR) scheme aimed at utilizing the design discharge of 110 m3/s to generate average annual hydro-based electric energy of 593 GWh. The catchment area at the proposed intake site is 4064 km2 and the rated head is 99.6 m.
  • Issue Date: 2018-09-20
  • Installed Capacity : 102.0 MW
  • Phase : Under Construction
mai khola

Middle Trishuli Ganga Nadi Hydropower Project

Gerkhu, Nuwakot

  • Issue Date: 2018-09-20
  • Installed Capacity : 65 MW
  • Phase : Application for Generation License
  • Type : Run-of-River
mai khola

Gandigad Small Hydropower Project

Kolpetara, Baitadi

  • Issue Date: 2018-09-20
  • Installed Capacity : 1 MW
  • Phase : Under Construction