dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

1

Projects

Maiwa Khola

Taplejung

  • Upper Maiwa HPP
mai khola

1

Projects

Budum Khola

Solukhumbu

  • Budum HEP
mai khola

1

Projects

Nimrung Khola

Gorkha

  • NImrung Khola HEP
mai khola

1

Projects

Nyamya Masai Khola

Sindhupalchok

  • Upper Brahmayeni HEP
mai khola

1

Projects

Suti Khola

Manang

  • Suti Khola Hydropower Project
mai khola

1

Projects

Bhalaudi Khola

Kaski

  • Bhalaudi Khola HEP
mai khola

1

Projects

Sipa Khola

Sindhupalchok

  • Sipa Khola HEP
mai khola

1

Projects

Trishuli Khola

Rasuwa

  • Trishuli Khola
mai khola

1

Projects

Manahari Khola

Makawanpur

  • Manahari Khola HEP
mai khola

1

Projects

Kuwadi Khola

Bajura,Humla,Nawalparasi_E,Tanahu

  • Kuwadi Khola Hydropower Project
mai khola

1

Projects

Kyadusyo Khola

Kaski

  • Kyadusyo Khola Small HEP
mai khola

1

Projects

Rugru Gad

Darchula

  • Rugrugad Small HEP

Hydropower Projects

mai khola

Salubyani Gad Small Hydropower Project

Kalukheti, Bajhang

  • Issue Date: 2018-09-20
  • Installed Capacity : 0.233 MW
  • Phase : Application for Generation License
mai khola

Bajra Madi Hydropower Project

Kalika, Kaski

  • Issue Date: 2018-09-20
  • Installed Capacity : 24.8 MW
  • Phase : Under Construction
  • Type : Run-0f-River
mai khola

Tadi Khola Cascade Hydropower Project

Samundratar, Nuwakot

  • Application Date: 2018-06-13
  • Installed Capacity : 3 MW
  • Phase : Under Construction
  • Type : Run-of-River, Cascade
mai khola

Likhu Khola Hydropower Project

Rawadolu,Khijichandeshwari (Okhaldhunga) Pritee,Kubukasthali (Ramechhap) Goli (Solukhumbu)

Likhu Khola Hydropower Project is a run-of-the-river type scheme located at Rawadolu, Kubu Kasthali, Khiji Kati, Khiji Chandeswori and Preeti VDCs of Okhaldhunga & Ramechhap district of Sagarmatha and Janakpur zones of Central Region of Nepal. The headworks site is located 250m downstream of the confluence of Likhu river and Sapsu khola. The powerhouse is located immediately downstream of the suspension bridge over Likhu Khola at Tosipa village. The approximate distances of powerhouse and headworks of proposed project from Bhandara Bazaar, the nearest Bazaar from the project area, 8 and 12 km respectively.
  • Issue Date: 2018-09-20
  • Installed Capacity : 30 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Nyadi- Phidi Hydropower Project

Bahundada, Lamjung

  • Issue Date: 2018-09-20
  • Installed Capacity : 24 MW
  • Phase : Under Construction
mai khola

Kaligandaki Gorge Hydropower Project

Narchyang,Dana (Myagdi)

  • Issue Date: 2018-09-20
  • Installed Capacity : 164 MW
  • Phase : Under Construction
mai khola

Theule Khola Hydropower Project

Baglung

  • Commercial Operation Date : 2018-07-08
  • Installed Capacity : 1.5 MW
  • Phase : Live
mai khola

Kulekhani 3 Hydropower Project

Bhaise (Makawanpur)

  • Issue Date: 2008-03-30
  • Installed Capacity : 14 MW
  • Phase : Under Construction
mai khola

Giri Khola Hydropower Project

Haku (Jumla)

  • Installed Capacity : 0.214 MW
  • Phase : Under Construction
mai khola

Salleri Chialsa Small Hydropower Project

Haku (Jumla)

  • Issue Date: 2010-07-01
  • Installed Capacity : 0.6 MW
  • Phase : Under Construction
mai khola

Upper Khadam Small Hydropower Project

Patigaun (Morang)

  • Issue Date: 2010-09-04
  • Installed Capacity : 0.99 MW
  • Phase : Under Construction
mai khola

Lower Modi Khola Hydropower Project

Durlung,Deurali,Ramja,Tilahar (Parbat)

MEL is developing 20 MW Lower Modi Khola Hydroelectric Project, located in Parbat District. The annual generation of energy is 117 GWh. The project is under construction.The Lower Modi Hydroelectric Project (LMHEP) is located in Deopur, Bajung, Tilahar,Durlung and Chuwa Village Development Committee of Parbat District in the Western Development Region of Nepal.
  • Issue Date: 2010-09-06
  • Installed Capacity : 20 MW
  • Phase : Under Construction