The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

1

Projects

Thosne Khola

Lalitpur

  • Thosne Khola Small Hydropower Project
mai khola

1

Projects

Ludi Khola

Gorkha

  • Ludee Khola Small Hydroelectric Project
mai khola

1

Projects

Ribal Khola

Sindhupalchok

  • Ribal Khola Small Hydroelectric Project
mai khola

1

Projects

Thali Gad

Darchula

  • Thaligad Small Hydroelectric Project
mai khola

1

Projects

Bhalu Khola

Bara,Bardiya,Bhojpur,Chitwan,Dadeldhura,Dailekh,Dang,Dhading,Dhankuta,Dolpa,Doti,Gorkha,Gulmi,Humla,Ilam,Jhapa,Jumla,Kabhrepalanchok,Kailali,Kaski,Khotang,Lalitpur,Makawanpur,Nawalparasi_E,Nu

  • Bhalu Khola Hydroelectric Project
mai khola

1

Projects

Tirija Khola

Myagdi

  • Tirija Khola Hydroelectric Project
mai khola

1

Projects

Chhilung Khola

Gorkha

  • Chilun Khola Hydroelectric Project
mai khola

1

Projects

Saldim Khola

Sankhuwasabha

  • Saldim Khola Hydroelectric Project
mai khola

1

Projects

Rapti River

Arghakhanchi,Banke,Dang,Pyuthan

  • Naumure Storage Hydroelectric Project
mai khola

1

Projects

Hudi Khola

Gorkha

  • Hudi Khola Small Hydropower Project
mai khola

1

Projects

Dana Khola

Manang

  • Duna Lake Hydroelectric Project
mai khola

1

Projects

Bakang Khola

Sankhuwasabha

  • Bakan Khola Hydroelectric Project

Hydropower Projects

mai khola

Rauje Khola HPP

Takasindu (Solukhumbu)

  • Issue Date: 2017-08-25
  • Installed Capacity : 4.99 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Upper Bhurundi Khola- A Small HEP

Dangsing (Kaski)

  • Issue Date: 2017-08-18
  • Installed Capacity : 4.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Chukeni Mini Hydropower Project

Chukeni (Patalkot)

  • Issue Date: 2018-05-13
  • Installed Capacity : 0.998 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Upper Sit Khola SHP

Jukena,Juluke (Arghakhanchi)

  • Issue Date: 2014-05-18
  • Installed Capacity : 0.905 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Khadigad Khola

Syalakhadi (Rukum)

  • Issue Date: 2014-09-18
  • Installed Capacity : 0.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Gumu Khola HEP

Lamidada,Sunakhani (Dolakha)

  • Issue Date: 2016-09-05
  • Installed Capacity : 0.95 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Masina HPP

Lekhnath (Kaski) Dulegauda (Tanahu)

  • Issue Date: 2017-02-01
  • Installed Capacity : 0.8 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghatte Khola Small HPP

Golche (Sindhupalchok)

  • Issue Date: 2017-03-24
  • Installed Capacity : 0.99 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Garjan Khola Small HPP

Chuchure (Ramechhap)

  • Issue Date: 2017-04-13
  • Installed Capacity : 0.9 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lung Khola Small HEP

  • Issue Date: 2018-05-13
  • Installed Capacity : 0.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Jhakre-2 Mini HPP

Thulopatal,Hawa (Dolakha)

  • Issue Date: 2017-10-18
  • Installed Capacity : 0.4 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Kisedi KHola HEP

Pachok (Lamjung)

  • Issue Date: 2017-08-22
  • Installed Capacity : 0.998 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river