The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

7

Projects

Piluwa Khola

Sankhuwasabha

  • Lower Piluwa Hydropower Project
  • Down Piluwa Hydropower Project
  • Upper Piluwa Khola-2 Small Hydropower Project
  • Upper Piluwa Hills Small Hydropower Project
  • Piluwa Khola Small Hydropower Project
  • Upper Piluwa 3 HPP
  • Upper Piluwa-1
mai khola

7

Projects

Tadi Khola

Nuwakot

  • Lower Tadi Hydropower Project
  • Upper Tadi Hydropower Project
  • Tadi Khola hydropower Project
  • Tadi Ghyamphedi HPP
  • Tadi Khola
  • Tadi Khola Cascade Hydropower Project
  • Middle Tadi Khola Hydropower Project
mai khola

7

Projects

Solu Khola

Solukhumbu

  • Lower Solu Hydropower Project
  • Salleri Chialsa Small Hydropower Project
  • Upper Solu Khola Hydropower Project
  • Solu Khola (Dudha Koshi) Hydropower Project
  • Solu Hydropower Project
  • Mid Solu Khola Hydropower Project
  • Dudhkunda Khola HEP
mai khola

7

Projects

Myagdi Khola

Myagdi

  • Durbang Myagdi Khola Hydropower Projcet
  • Myagdi Khola- B HEP
  • Myagdi Khola A HEP
  • Middle Myagdi HPP
  • Upper Myagdi-I Hydroelectric Project
  • Myagdi Khola Hydropower Project
  • Upper Myagdi Hydropower Project
mai khola

6

Projects

Daraundi Nadi

Gorkha,Tanahu

  • Daraundi-1 Hydropower Project
  • Daraundi A Hydroelectric Project
  • Upper Daraudi-C HPP
  • Upper Daraudi B Small HPP
  • Madya Super Daraundi HPP
  • Upper Daraudi Hydropower Project
mai khola

6

Projects

Midim Khola

Kaski,Lamjung

  • Midim Khola Micro Hydro Project
  • Middle Midim Hydropower Project
  • Lower Midim Khola Small Hydropower Project
  • Midim Khola Hydropower Project
  • Upper Midim Khola SHP
  • Midim 1 HEP
mai khola

6

Projects

Sabha Khola

Sankhuwasabha

  • Sabha Khola A Hydropower Project
  • Sabha Khola-B Hydropower Project
  • Supper Sabha Khola Small HPP
  • Sabha Khola C HPP
  • Sabha Khola Hydropower Project
  • Sabha Khola A HEP
mai khola

6

Projects

Tamakoshi River

Dolakha,Ramechhap,Sindhuli

  • Babiyodada Manthali Khola Micro Hydropower Project
  • Rawa Chyalabyala Fisur Khola Micro Hydroelectric Project
  • Upper Tamakoshi Hydropower Project
  • Tamakoshi V Hydropower Project
  • Lapche-Tamakoshi HEP
  • Tamakoshi- 9 HEP
mai khola

6

Projects

Dordi Khola

Lamjung

  • Super Dordi Kha Hydropower Project
  • Upper Dordi A Hydroelectric Project
  • Dordi Khola Hydropower Project
  • Dordi-1 Hydropower Project
  • Dordi Dudh Khola Small HEP
  • Himchuli Dordi HEP
mai khola

6

Projects

Rawa Khola

Achham,Doti,Khotang

  • Rawa Khola Hydropower Project
  • Mid Rawa Khola HEP
  • Rawa Khola HEP
  • Lower Mid Rawa Khola HEP
  • Mid Rawa Khola HEP
  • Rawa Khola Hydropower Project
mai khola

6

Projects

Balephi Khola

Sindhupalchok

  • Balephi A Hydropower Project
  • Balephi Hydropower Project
  • Upper Balephi A Hydropower Project
  • Balephi Cascade HEP
  • Lower Balephi
  • Upper Balefhi
mai khola

6

Projects

Iwa Khola

Panchthar,Taplejung

  • Super Iwa Khola HEP
  • Lower Iguwa Khola Hydro-Electric Project
  • MIddle Ingwa Khola Hydropower Project
  • Upper Most Iwa Khola HEP
  • Super Most Iwa
  • Iwa Khola Hydropower Project

Hydropower Projects

mai khola

Dhansi Khola Mini Hydropower Project

Dhawang,Liwang,Whama (Rolpa)

  • Issue Date: 2010-10-16
  • Installed Capacity : 0.996 MW
  • Phase : Under Construction
mai khola

Upper Tamakoshi Hydropower Project

Bulung,Gauri Sankar,Khare,Lamabagar,Sunakhani,Sundrawati (Dolakha)

The Upper Tamakoshi Hydroelectric Project is a 456 MW peaking run-of-the-river hydroelectric project in Nepal. It is the largest hydroelectric project in Nepal, and was originally slated for completion in July 2018, later pushed back to December 2018, and again pushed back to November 2019.It is sited on the Tamakoshi River (also spelled Tamba Koshi), a tributary of the Sun Kosi river (also spelled Sunkoshi), near the Nepal–Tibet border. The Upper Tamakoshi Hydroelectric Project is a Nepal national priority project. When it is completed, it is projected be the largest hydroelectric plant in Nepal, with a power output equivalent to two-thirds of Nepal's current power generation.[2][5] The Project is entirely financed from domestic financial institutions and companies.
  • Issue Date: 2010-12-03
  • Installed Capacity : 456 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Upper Trishuli 3A Hydropower Project

Dandagoun,Laharepouwa,Thulogoun,Ramche (Rasuwa)

  • Issue Date: 2011-02-27
  • Installed Capacity : 60 MW
  • Phase : Live
mai khola

Pikhuwa Khola Hydropower Project

Kota,Bokhim,Bhojpur (Bhojpur)

  • Issue Date: 2011-03-26
  • Installed Capacity : 5 MW
  • Phase : Live
mai khola

Khani Khola - 1 Hydropower Project

Khare,Marbu (Dolakha)

  • Issue Date: 2011-05-11
  • Installed Capacity : 40 MW
  • Phase : Under Construction
mai khola

Dordi Khola Hydropower Project

Archalbot,Chiti,Dhodeni,Nauthar,Shree Banjyang,Udipur (Lamjung)

Dordi Khola Hydropower Project is a Run-of-River type hydroelectric project with generating capacity of 27 MW. The project is being developed by Himalayan Power Partner Ltd. (HPPL) Kathmandu, Nepal. HPPL is promoted by IME Group and later joined by NRN Investment Ltd. to develop Dordi Khola HPP with equity sharing in 49:51 ratios. This is the first corporate investment of Non Resident Nepalese (NRN) in Nepal. Feasibility Study of the Project was completed in March 2010. Detail Project Report (DPR) is prepared by international consultant Entura Hydro Tasmania.
  • Issue Date: 2011-07-07
  • Installed Capacity : 27 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Rahughat Hydropower Project

Jhin (Myagdi)

  • Issue Date: 2011-07-19
  • Installed Capacity : 40 MW
  • Phase : Under Construction
mai khola

Middle Tadi Khola Hydropower Project

Rautbesi,Samundratar,Shikharbesi (Nuwakot)

  • Application Date: 2018-11-15
  • Installed Capacity : 5.5 MW
  • Phase : Under Construction
mai khola

Jumdi Khola Small Hydropower Project

Bharse,Hasara,Juhang (Gulmi)

  • Issue Date: 2011-10-24
  • Installed Capacity : 1.75 MW
  • Phase : Under Construction
mai khola

Mristi Khola Hydropower Project

Dana,Narchyang (Myagdi)

  • Issue Date: 2011-11-06
  • Installed Capacity : 42 MW
  • Phase : Under Construction
mai khola

Sanjen Hydropower Project

Chilime (Rasuwa)

Sanjen Jalavidhyut Company Limited (SJCL), a company promoted by Chilime Hydropower Company Limited (CHPCL), is a public limited company established in 2010 AD with the objective of harnessing hydropower potential of the county with maximum participation of local people in the projects’ ownership and mobilization of local resources for the successful implementation of various hydroelectric projects.
  • Issue Date: 2011-11-28
  • Installed Capacity : 42.5 MW
  • Phase : Under Construction
  • Type : Cascade
mai khola

Upper Mailung -A Hydropower Project

Gatlang,Haku (Rasuwa)

  • Issue Date: 2011-12-27
  • Installed Capacity : 6.42 MW
  • Phase : Under Construction
  • Type : Run of River