34

note

Application for Survey License Projects

29

note

Application for Generation License Projects

208

note

Under Construction Hydropower Projects

94

note

Live Hydropower Projects

289

note

No. of Rivers with Hydropower Projects

dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

7

Projects

Tadi Khola

Nuwakot

  • Middle Tadi Khola Hydropower Project
  • Lower Tadi Hydropower Project
  • Upper Tadi Hydropower Project
  • Tadi Khola hydropower Project
  • Tadi Ghyamphedi HPP
  • Tadi Khola
  • Tadi Khola Cascade Hydropower Project
mai khola

7

Projects

Solu Khola

Solukhumbu

  • Lower Solu Hydropower Project
  • Salleri Chialsa Small Hydropower Project
  • Upper Solu Khola Hydropower Project
  • Solu Khola (Dudha Koshi) Hydropower Project
  • Solu Hydropower Project
  • Dudhkunda Khola HEP
  • Mid Solu Khola Hydropower Project
mai khola

7

Projects

Myagdi Khola

Myagdi

  • Upper Myagdi-I Hydroelectric Project
  • Upper Myagdi Hydropower Project
  • Durbang Myagdi Khola Hydropower Projcet
  • Myagdi Khola Hydropower Project
  • Myagdi Khola- B HEP
  • Myagdi Khola A HEP
  • Middle Myagdi HPP
mai khola

6

Projects

Bhotekoshi River

Sindhupalchok,Solukhumbu

  • Madhya Bhotekoshi Hydropower Project
  • Rasuwa Bhotekoshi Hydropower Project
  • Rasuwagadhi Hydropower Project
  • Upper Bhotekoshi Hydroelectric Project
  • Botekoshi 5 HEP
  • Bhotekoshi Khola HEP
mai khola

6

Projects

Daraundi Nadi

Gorkha,Tanahu

  • Daraundi-1 Hydropower Project
  • Daraundi A Hydroelectric Project
  • Upper Daraudi Hydropower Project
  • Upper Daraudi-C HPP
  • Madya Super Daraundi HPP
  • Upper Daraudi B Small HPP
mai khola

6

Projects

Midim Khola

Kaski,Lamjung

  • Midim Khola Micro Hydro Project
  • Middle Midim Hydropower Project
  • Lower Midim Khola Small Hydropower Project
  • Midim Khola Hydropower Project
  • Upper Midim Khola SHP
  • Midim 1 HEP
mai khola

6

Projects

Sabha Khola

Sankhuwasabha

  • Sabha Khola A Hydropower Project
  • Sabha Khola-B Hydropower Project
  • Supper Sabha Khola Small HPP
  • Sabha Khola C HPP
  • Sabha Khola Hydropower Project
  • Sabha Khola A HEP
mai khola

6

Projects

Tamakoshi River

Dolakha,Ramechhap,Sindhuli

  • Babiyodada Manthali Khola Micro Hydropower Project
  • Rawa Chyalabyala Fisur Khola Micro Hydroelectric Project
  • Upper Tamakoshi Hydropower Project
  • Tamakoshi V Hydropower Project
  • Lapche-Tamakoshi HEP
  • Tamakoshi- 9 HEP
mai khola

6

Projects

Dordi Khola

Lamjung

  • Super Dordi Kha Hydropower Project
  • Upper Dordi A Hydroelectric Project
  • Dordi Khola Hydropower Project
  • Dordi-1 Hydropower Project
  • Himchuli Dordi HEP
  • Dordi Dudh Khola Small HEP
mai khola

6

Projects

Rawa Khola

Achham,Doti,Khotang

  • Rawa Khola Hydropower Project
  • Rawa Khola Hydropower Project
  • Mid Rawa Khola HEP
  • Mid Rawa Khola HEP
  • Rawa Khola HEP
  • Lower Mid Rawa Khola HEP
mai khola

6

Projects

Balephi Khola

Sindhupalchok

  • Balephi A Hydropower Project
  • Balephi Hydropower Project
  • Upper Balephi A Hydropower Project
  • Upper Balefhi
  • Lower Balephi
  • Balephi Cascade HEP
mai khola

6

Projects

Iwa Khola

Panchthar,Taplejung

  • Iwa Khola Hydropower Project
  • Super Iwa Khola HEP
  • Lower Iguwa Khola Hydro-Electric Project
  • MIddle Ingwa Khola Hydropower Project
  • Upper Most Iwa Khola HEP
  • Super Most Iwa

Hydropower Projects

mai khola

Isuwa Khola Hydropower Project

Makalu (Sankhuwasabha)

  • Issue Date: 2015-02-16
  • Installed Capacity : 97.2 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Himchuli Dordi HEP

Dhodeni,Faleni (Lamjung)

  • Issue Date: 2015-03-27
  • Installed Capacity : 57 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Jum Khola Hydropower Project

Lamabagar (Dolakha)

  • Issue Date: 2015-12-24
  • Installed Capacity : 56 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Dudhkoshi-6 HEP

Chaurikharka (Solukhumbu)

  • Issue Date: 2016-03-15
  • Installed Capacity : 83 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghunsa Khola HEP

Lelep (Taplejung)

  • Issue Date: 2016-08-02
  • Installed Capacity : 71.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Simbuwa Khola Hydroelectric Project

Tapethok (Taplejung)

  • Issue Date: 2016-08-02
  • Installed Capacity : 53.7 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Middle Mewa HPP

Liwang,Sanwa,Nalbu,Papung,Thukima (Taplejung)

  • Issue Date: 2016-12-20
  • Installed Capacity : 49 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Sani Bheri HPP

Rangsi (Rukum)

  • Issue Date: 2017-03-09
  • Installed Capacity : 44.52 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Hongu Khola HEP

Chheskam (Solukhumbu)

  • Issue Date: 2017-04-03
  • Installed Capacity : 28.9 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Nyasim Hydropower Project

Gumba (Sindhupalchok)

  • Issue Date: 2017-04-21
  • Installed Capacity : 35 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghunsa-Tamor HEP

Lelep (Taplejung)

  • Issue Date: 2017-05-12
  • Installed Capacity : 43 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lower Isuwa Khola HPP

Makalu (Sankhuwasabha)

  • Issue Date: 2017-05-15
  • Installed Capacity : 37.7 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river