34

note

Application for Survey License Projects

29

note

Application for Generation License Projects

208

note

Under Construction Hydropower Projects

94

note

Live Hydropower Projects

289

note

No. of Rivers with Hydropower Projects

dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

7

Projects

Tadi Khola

Nuwakot

  • Middle Tadi Khola Hydropower Project
  • Lower Tadi Hydropower Project
  • Upper Tadi Hydropower Project
  • Tadi Khola hydropower Project
  • Tadi Ghyamphedi HPP
  • Tadi Khola
  • Tadi Khola Cascade Hydropower Project
mai khola

7

Projects

Solu Khola

Solukhumbu

  • Lower Solu Hydropower Project
  • Salleri Chialsa Small Hydropower Project
  • Upper Solu Khola Hydropower Project
  • Solu Khola (Dudha Koshi) Hydropower Project
  • Solu Hydropower Project
  • Dudhkunda Khola HEP
  • Mid Solu Khola Hydropower Project
mai khola

7

Projects

Myagdi Khola

Myagdi

  • Upper Myagdi-I Hydroelectric Project
  • Upper Myagdi Hydropower Project
  • Durbang Myagdi Khola Hydropower Projcet
  • Myagdi Khola Hydropower Project
  • Myagdi Khola- B HEP
  • Myagdi Khola A HEP
  • Middle Myagdi HPP
mai khola

6

Projects

Bhotekoshi River

Sindhupalchok,Solukhumbu

  • Madhya Bhotekoshi Hydropower Project
  • Rasuwa Bhotekoshi Hydropower Project
  • Rasuwagadhi Hydropower Project
  • Upper Bhotekoshi Hydroelectric Project
  • Botekoshi 5 HEP
  • Bhotekoshi Khola HEP
mai khola

6

Projects

Daraundi Nadi

Gorkha,Tanahu

  • Daraundi-1 Hydropower Project
  • Daraundi A Hydroelectric Project
  • Upper Daraudi Hydropower Project
  • Upper Daraudi-C HPP
  • Madya Super Daraundi HPP
  • Upper Daraudi B Small HPP
mai khola

6

Projects

Midim Khola

Kaski,Lamjung

  • Midim Khola Micro Hydro Project
  • Middle Midim Hydropower Project
  • Lower Midim Khola Small Hydropower Project
  • Midim Khola Hydropower Project
  • Upper Midim Khola SHP
  • Midim 1 HEP
mai khola

6

Projects

Sabha Khola

Sankhuwasabha

  • Sabha Khola A Hydropower Project
  • Sabha Khola-B Hydropower Project
  • Supper Sabha Khola Small HPP
  • Sabha Khola C HPP
  • Sabha Khola Hydropower Project
  • Sabha Khola A HEP
mai khola

6

Projects

Tamakoshi River

Dolakha,Ramechhap,Sindhuli

  • Babiyodada Manthali Khola Micro Hydropower Project
  • Rawa Chyalabyala Fisur Khola Micro Hydroelectric Project
  • Upper Tamakoshi Hydropower Project
  • Tamakoshi V Hydropower Project
  • Lapche-Tamakoshi HEP
  • Tamakoshi- 9 HEP
mai khola

6

Projects

Dordi Khola

Lamjung

  • Super Dordi Kha Hydropower Project
  • Upper Dordi A Hydroelectric Project
  • Dordi Khola Hydropower Project
  • Dordi-1 Hydropower Project
  • Himchuli Dordi HEP
  • Dordi Dudh Khola Small HEP
mai khola

6

Projects

Rawa Khola

Achham,Doti,Khotang

  • Rawa Khola Hydropower Project
  • Rawa Khola Hydropower Project
  • Mid Rawa Khola HEP
  • Mid Rawa Khola HEP
  • Rawa Khola HEP
  • Lower Mid Rawa Khola HEP
mai khola

6

Projects

Balephi Khola

Sindhupalchok

  • Balephi A Hydropower Project
  • Balephi Hydropower Project
  • Upper Balephi A Hydropower Project
  • Upper Balefhi
  • Lower Balephi
  • Balephi Cascade HEP
mai khola

6

Projects

Iwa Khola

Panchthar,Taplejung

  • Iwa Khola Hydropower Project
  • Super Iwa Khola HEP
  • Lower Iguwa Khola Hydro-Electric Project
  • MIddle Ingwa Khola Hydropower Project
  • Upper Most Iwa Khola HEP
  • Super Most Iwa

Hydropower Projects

mai khola

Chhandi Khola Hydropower Project

Lamjung, Gandaki

Chhandi Khola Small Hydropower Project is a run-of-river type hydropower scheme aimed with utilizing water discharge from Chhandi & Ghatte Khola, a tributary of Dordi River for power generation. The Project has an installed capacity of 2.0 MW. The project utilizes gross head of about 186.0 m and design discharge of 1.30 m3/s (1.03 m3/s from Chhandi Khola and 0.297 m3/s from Ghatte Khola) to generate an annual average energy of 11.204 GWh.
  • Commercial Operation Date : 2106-03-26
  • Installed Capacity : 2 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Bhairabkund Small Hydropower Project

Sindhupalchok

  • Commercial Operation Date : 2014-05-16
  • Installed Capacity : 3 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Mailung Khola Hydropower Project

Rasuwa

  • Commercial Operation Date : 2014-03-17
  • Installed Capacity : 5 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Molun Khola Small Hydropower Project

Okhaldhunga

  • Commercial Operation Date : 2018-02-24
  • Installed Capacity : 7 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Dhad Khola Small Hydropower Project

Dharampani, Tanahun

  • Issue Date: 2010-03-10
  • Installed Capacity : 2.720 MW
  • Phase : Application for Generation License
  • Type : Run-of-River
mai khola

Super Hewa Hydropower Project

Jaljala,Siddhapokhari (Sankhuwasabha)

  • Issue Date: 2010-08-29
  • Installed Capacity : 5.0 MW
  • Phase : Under Construction
mai khola

Upper Marsyangdi- 2 Hydropower Project

Ghermu,Taghring (Lamjung)

  • Issue Date: 2011-09-12
  • Installed Capacity : 600 MW
  • Phase : Application for Generation License
mai khola

Upper Rahughat Hydropower Project

Chimkhola, Myagdi

  • Issue Date: 2013-06-17
  • Installed Capacity : 48.5 MW
  • Phase : Under Construction
mai khola

Jhyaku Khola Hydropower Project

Jhyaku, Dolakha

  • Issue Date: 2018-09-20
  • Installed Capacity : 5.243 MW
  • Phase : Under Construction
mai khola

Dudhkoshi-2 (Jaleswar) Hydropower Project

Deusa, Solukhumbhu

  • Issue Date: 2018-09-20
  • Installed Capacity : 240 MW
  • Phase : Application for Generation License
mai khola

Upper Trishuli-2 Hydropower Project

Haku, Rasuwa

The proposed Upper Trishuli-2 Hydroelectric project of 102 MW capacity is situated 127 km north of Kathmandu, the capital city of Nepal, on the Trishuli River about 950 m downstream of Chilime Powerhouse (22 MW) in the Rasuwa District of Bagmati zone in the Central Development Region of Nepal. Proposed project is a Run-of-River (RoR) scheme aimed at utilizing the design discharge of 110 m3/s to generate average annual hydro-based electric energy of 593 GWh. The catchment area at the proposed intake site is 4064 km2 and the rated head is 99.6 m.
  • Issue Date: 2018-09-20
  • Installed Capacity : 102.0 MW
  • Phase : Under Construction
mai khola

Middle Trishuli Ganga Nadi Hydropower Project

Gerkhu, Nuwakot

  • Issue Date: 2018-09-20
  • Installed Capacity : 65 MW
  • Phase : Application for Generation License