dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

0

Projects

Gongar Khola

Dolakha

mai khola

0

Projects

Pelma Khola

Rukum_E

mai khola

0

Projects

Seti Khola

Banke,Ilam,Kailali,Makawanpur,Okhaldhunga,Ramechhap,Salyan

mai khola

0

Projects

Shikharjung Khola

Dolakha

mai khola

0

Projects

Miwaie Khola

Kaski

mai khola

0

Projects

Indrawati Nadi

Kabhrepalanchok,Sindhupalchok

mai khola

0

Projects

Hawa Khola

Dolakha,Ramechhap

mai khola

0

Projects

Hongu Khola

Solukhumbu

mai khola

0

Projects

Nupche Khola

Ramechhap

mai khola

0

Projects

Soti Khola

Dailekh,Gorkha,Ilam,Lamjung,Manang

mai khola

0

Projects

Adhi Khola

Myagdi,Parbat,Syangja

mai khola

0

Projects

Nalsyagu Khola

Jajarkot

Hydropower Projects

mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200 MW
  • Phase : Survey License Approved
mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lower jogmai Khola

1 2 3 4 Previous Next Salient Features Project Developed By Asian Hydropower Ltd. Lower Jogmai Khola Hydropower Project is a simple Run Off River type hydropower project located in Ilam District of eastern Nepal. The project lies at the end reach of Jogmai River within close proximity of Mai Beni Hydropower Project, where the river meets the Mai river. The Installed Capacity of the project is 6.2 MW. The project is easily accessible via multiple access roads at the moment. The easiest access is through a 3 km road from Mechi highway at Shilpur upto the powerhouse area. 33/132 kV Godak substation is only 4km away from the powerhouse for power evacuation.
  • Issue Date: 2019-06-27
  • Phase : Under Construction
  • Type : Run of River
mai khola

Tadi Khola

Nuwakot

  • Issue Date: 2011-09-21
  • Installed Capacity : 5 MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Thoppal Khola Hydropower Project

Dhading

  • Commercial Operation Date : 2007-08-09
  • Installed Capacity : 1.650 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Super Mai Hydropower Project

Illam

  • Commercial Operation Date : 2018-10-28
  • Installed Capacity : 7.8 MW
  • Phase : Live
mai khola

Chisang Khola -A Small HEP

Dhankuta,Morang

  • Application Date: 2019-03-17
  • Installed Capacity : 1.8 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Dudhkunda Khola HEP

Dhankuta,Morang

  • Application Date: 2019-03-19
  • Installed Capacity : 12 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Tiplyang Kaligandaki HEP

  • Application Date: 2019-03-25
  • Installed Capacity : 58 MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Sagu khola 1 HPP

Dolakha

  • Application Date: 2016-07-26
  • Installed Capacity : 5.5 MW
  • Phase : Under Construction
  • Type : Run Of River