34

note

Application for Survey License Projects

29

note

Application for Generation License Projects

208

note

Under Construction Hydropower Projects

94

note

Live Hydropower Projects

289

note

No. of Rivers with Hydropower Projects

dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

0

Projects

Humla Karnali Nadi

Humla,Mugu

Hydropower Projects

mai khola

Isuwa Khola Hydropower Project

Makalu (Sankhuwasabha)

  • Issue Date: 2015-02-16
  • Installed Capacity : 97.2 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Himchuli Dordi HEP

Dhodeni,Faleni (Lamjung)

  • Issue Date: 2015-03-27
  • Installed Capacity : 57 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Jum Khola Hydropower Project

Lamabagar (Dolakha)

  • Issue Date: 2015-12-24
  • Installed Capacity : 56 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Dudhkoshi-6 HEP

Chaurikharka (Solukhumbu)

  • Issue Date: 2016-03-15
  • Installed Capacity : 83 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghunsa Khola HEP

Lelep (Taplejung)

  • Issue Date: 2016-08-02
  • Installed Capacity : 71.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Simbuwa Khola Hydroelectric Project

Tapethok (Taplejung)

  • Issue Date: 2016-08-02
  • Installed Capacity : 53.7 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Middle Mewa HPP

Liwang,Sanwa,Nalbu,Papung,Thukima (Taplejung)

  • Issue Date: 2016-12-20
  • Installed Capacity : 49 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Sani Bheri HPP

Rangsi (Rukum)

  • Issue Date: 2017-03-09
  • Installed Capacity : 44.52 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Hongu Khola HEP

Chheskam (Solukhumbu)

  • Issue Date: 2017-04-03
  • Installed Capacity : 28.9 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Nyasim Hydropower Project

Gumba (Sindhupalchok)

  • Issue Date: 2017-04-21
  • Installed Capacity : 35 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghunsa-Tamor HEP

Lelep (Taplejung)

  • Issue Date: 2017-05-12
  • Installed Capacity : 43 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lower Isuwa Khola HPP

Makalu (Sankhuwasabha)

  • Issue Date: 2017-05-15
  • Installed Capacity : 37.7 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river