The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

2

Projects

Phawa Khola

Dhankuta,Panchthar,Taplejung

  • Upper Phawa Hydropower Project
  • Phawa khola Hydropower Project
mai khola

2

Projects

Sardi Khola

Kaski

  • Sardikhola Hydropower Project
  • Upper Sardi Hydropower Project
mai khola

2

Projects

Tatopani Khola

Myagdi

  • Tatopani Small Hydropower Project
  • Ilep Tatopani Khola HPP
mai khola

2

Projects

Tinau Nadi

Palpa,Rupandehi

  • Tinau Hydropower
  • Tinau Khola Hydropower Project
mai khola

2

Projects

Jumdi Khola

Gulmi

  • Jumdi Khola Small Hydropower Project
  • Upper Jumdi Khola Hydropower Project
mai khola

2

Projects

Khare Khola

Achham,Bajhang,Bardiya,Dolakha,Jumla,Nuwakot,Rolpa,Rukum_E,Surkhet

  • Khare Hydropower Project
  • Lower Khare Hydropower Project
mai khola

2

Projects

Lohore Khola

Achham,Dailekh

  • Lohare Khola Hydropower Project
  • Upper Lohore Small Hydropower Peoject
mai khola

2

Projects

Rudi Khola

Bajura,Kaski,Lamjung

  • Rudi A Hydropower Project
  • Rudi Khola-B Hydropower Project
mai khola

2

Projects

Ghalemdi Khola

Myagdi

  • Super Ghalemdi HPP
  • Ghalemdi Khola Hydropower Project
mai khola

2

Projects

Rupse Khola

Bhojpur,Dhading,Myagdi,Udayapur

  • Rupse Khola Hydropower Project
  • Lower Rupse Khola HEP
mai khola

2

Projects

Suri Khola

Dolakha,Kapilbastu

  • Suri Khola Hydropower Project
  • Upper Suri Khola Hydropower Project
mai khola

2

Projects

Kalanga Nadi

Bajhang,Doti

  • Upper Kalangad Hydropower Project
  • Kalanga Hydropower Project

Hydropower Projects

mai khola

Rauje Khola HPP

Takasindu (Solukhumbu)

  • Issue Date: 2017-08-25
  • Installed Capacity : 4.99 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Upper Bhurundi Khola- A Small HEP

Dangsing (Kaski)

  • Issue Date: 2017-08-18
  • Installed Capacity : 4.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Chukeni Mini Hydropower Project

Chukeni (Patalkot)

  • Issue Date: 2018-05-13
  • Installed Capacity : 0.998 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Upper Sit Khola SHP

Jukena,Juluke (Arghakhanchi)

  • Issue Date: 2014-05-18
  • Installed Capacity : 0.905 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Khadigad Khola

Syalakhadi (Rukum)

  • Issue Date: 2014-09-18
  • Installed Capacity : 0.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Gumu Khola HEP

Lamidada,Sunakhani (Dolakha)

  • Issue Date: 2016-09-05
  • Installed Capacity : 0.95 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Masina HPP

Lekhnath (Kaski) Dulegauda (Tanahu)

  • Issue Date: 2017-02-01
  • Installed Capacity : 0.8 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghatte Khola Small HPP

Golche (Sindhupalchok)

  • Issue Date: 2017-03-24
  • Installed Capacity : 0.99 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Garjan Khola Small HPP

Chuchure (Ramechhap)

  • Issue Date: 2017-04-13
  • Installed Capacity : 0.9 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lung Khola Small HEP

  • Issue Date: 2018-05-13
  • Installed Capacity : 0.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Jhakre-2 Mini HPP

Thulopatal,Hawa (Dolakha)

  • Issue Date: 2017-10-18
  • Installed Capacity : 0.4 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Kisedi KHola HEP

Pachok (Lamjung)

  • Issue Date: 2017-08-22
  • Installed Capacity : 0.998 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river