34

note

Application for Survey License Projects

29

note

Application for Generation License Projects

208

note

Under Construction Hydropower Projects

94

note

Live Hydropower Projects

289

note

No. of Rivers with Hydropower Projects

dam side

About Nepal Water Resource Portal

The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

River with Hydropower Projects

mai khola

2

Projects

Kalanga Nadi

Bajhang,Doti

  • Upper Kalangad Hydropower Project
  • Kalanga Hydropower Project
mai khola

2

Projects

Chauri Khola

Kabhrepalanchok,Okhaldhunga,Ramechhap,Rukum_W,Sindhupalchok,Solukhumbu

  • Chauri Khola Hydropower Project
  • Upper Chauri Khola Hydropower Project
mai khola

2

Projects

Phalakhu Khola

Nuwakot,Rasuwa

  • Phalakhu Khola Hydropower Project
  • Phalakhu Khola Hydropower Project
mai khola

2

Projects

Chirkhuwa Khola

Bhojpur,Sankhuwasabha

  • Upper Chirkuwa Khola Hydropower Project
  • Lower Chirkhuwa Hydropower Project
mai khola

2

Projects

Tara Khola

Baglung,Pyuthan

  • Tara Khola Community (Mini) Hydropower Project
  • Middle Tara Khola Small Hydropower Project
mai khola

2

Projects

Nilgiri Khola

Myagdi

  • Nilgiri Khola Hydropower Project
  • Nilgiri Khola-II cascade Project
mai khola

2

Projects

Buku Khola

Dailekh,Okhaldhunga,Solukhumbu

  • Buku-Kapati Hydropower Project
  • Buku Khola Hydropower Project
mai khola

2

Projects

Richet Khola

Gorkha

  • Richet Khola Small Hydropower Project
  • Upper Richet Khola Small Hydropower Project
mai khola

2

Projects

Nwa Gad

Darchula

  • Nwa Gad Hydropower Project
  • Lower Nwagad Small Hydropower Project
mai khola

2

Projects

Belkhu Khola

Dhading,Makawanpur

  • Belkhu Khola Hydropower Project
  • Upper Belkhu Small Hydropower Project
mai khola

2

Projects

Tila Khola

Rukum_E

  • Tila-1 Hydropower Project
  • Tila-2 Hydropower Project
mai khola

2

Projects

Hadi Khola

Gorkha,Kabhrepalanchok,Kaski,Khotang,Lamjung,Sindhuli,Sindhupalchok,Solukhumbu,Syangja,Tanahu,Udayapur

  • Upper Hadi Khola Hydropower Project
  • Hadi Khola (Sunkoshi) A Hydropower Project

Hydropower Projects

mai khola

Isuwa Khola Hydropower Project

Makalu (Sankhuwasabha)

  • Issue Date: 2015-02-16
  • Installed Capacity : 97.2 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Himchuli Dordi HEP

Dhodeni,Faleni (Lamjung)

  • Issue Date: 2015-03-27
  • Installed Capacity : 57 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Jum Khola Hydropower Project

Lamabagar (Dolakha)

  • Issue Date: 2015-12-24
  • Installed Capacity : 56 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Dudhkoshi-6 HEP

Chaurikharka (Solukhumbu)

  • Issue Date: 2016-03-15
  • Installed Capacity : 83 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghunsa Khola HEP

Lelep (Taplejung)

  • Issue Date: 2016-08-02
  • Installed Capacity : 71.5 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Simbuwa Khola Hydroelectric Project

Tapethok (Taplejung)

  • Issue Date: 2016-08-02
  • Installed Capacity : 53.7 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Middle Mewa HPP

Liwang,Sanwa,Nalbu,Papung,Thukima (Taplejung)

  • Issue Date: 2016-12-20
  • Installed Capacity : 49 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Sani Bheri HPP

Rangsi (Rukum)

  • Issue Date: 2017-03-09
  • Installed Capacity : 44.52 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Hongu Khola HEP

Chheskam (Solukhumbu)

  • Issue Date: 2017-04-03
  • Installed Capacity : 28.9 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Nyasim Hydropower Project

Gumba (Sindhupalchok)

  • Issue Date: 2017-04-21
  • Installed Capacity : 35 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Ghunsa-Tamor HEP

Lelep (Taplejung)

  • Issue Date: 2017-05-12
  • Installed Capacity : 43 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lower Isuwa Khola HPP

Makalu (Sankhuwasabha)

  • Issue Date: 2017-05-15
  • Installed Capacity : 37.7 MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river