The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Application for Generation License Hydropower Projects

mai khola

Dhad Khola Small Hydropower Project

Dharampani, Tanahun

  • Issue Date: 2010-03-10
  • Installed Capacity : 2.720 MW
  • Phase : Application for Generation License
  • Type : Run-of-River
mai khola

Upper Marsyangdi- 2 Hydropower Project

Ghermu,Taghring (Lamjung)

  • Issue Date: 2011-09-12
  • Installed Capacity : 600 MW
  • Phase : Application for Generation License
mai khola

Middle Trishuli Ganga Nadi Hydropower Project

Gerkhu, Nuwakot

  • Issue Date: 2018-09-20
  • Installed Capacity : 65 MW
  • Phase : Application for Generation License
mai khola

Salubyani Gad Small Hydropower Project

Kalukheti, Bajhang

  • Issue Date: 2018-09-20
  • Installed Capacity : 0.233 MW
  • Phase : Application for Generation License
mai khola

Nyadi- Phidi Hydropower Project

Bahundada, Lamjung

  • Issue Date: 2018-09-20
  • Installed Capacity : 24 MW
  • Phase : Application for Generation License
mai khola

Tamor Mewa Hydropower Project

Taplejung

  • Application Date: 2018-12-20
  • Installed Capacity : 128 MW
  • Phase : Application for Generation License
mai khola

Upper Budhiganga B Hydropower Project

Bajura

  • Application Date: 2019-01-19
  • Installed Capacity : 8.4 MW
  • Phase : Application for Generation License
mai khola

Upper Irkhuwa Hydropower Project

Dobhane,Khatamma,Kudak Kaule (Bhojpur)

  • Application Date: 2018-09-23
  • Installed Capacity : 14.500 MW
  • Phase : Application for Generation License
mai khola

Tiplyang Kaligandaki HEP

  • Application Date: 2019-03-25
  • Installed Capacity : 58 MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Upper Daraudi Hydropower Project

Ghyalchok,Simjung,Saurpani (Gorkha)

  • Application Date: 2019-04-03
  • Installed Capacity : 9.200 MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Aayu Malun Khola HEP

Okhaldhunga

  • Application Date: 2019-04-26
  • Installed Capacity : 21 MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Lower Barun Khola HPP

Hatiya (Sankhuwasabha)

  • Application Date: 2019-06-06
  • Installed Capacity : 132 MW
  • Phase : Application for Generation License
  • Type : Run Of River