The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Application for Survey License Hydropower Projects

mai khola

Hudi Khola Small Hydropower Project

  • Application Date: 2018-04-05
  • Installed Capacity : 0.66 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Nisi Khola Small Hydroelectric Project

  • Application Date: 2018-06-25
  • Installed Capacity : 0.95 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Taranga Khola Small Hydroelectric Project

  • Application Date: 2018-07-22
  • Installed Capacity : 0.67 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Babiyodada Manthali Khola Micro Hydropower Project

Lamabagar (Dolakha)

  • Application Date: 2018-09-17
  • Installed Capacity : 0.47 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Thosne Khola Small Hydropower Project

Bhattedanda,Dalchoki,Sankhu (Lalitpur)

  • Application Date: 2018-10-08
  • Installed Capacity : 0.7 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Sota Damuka Multipurpose Micro Hydroelectric Project

  • Application Date: 2018-11-25
  • Installed Capacity : 0.3 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Rawa Chyalabyala Fisur Khola Micro Hydroelectric Project

Lamabagar (Dolakha)

  • Application Date: 2018-11-28
  • Installed Capacity : 0.25 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Ludee Khola Small Hydroelectric Project

  • Application Date: 2018-11-30
  • Installed Capacity : 0.99 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Ribal Khola Small Hydroelectric Project

Kiwool (Sindhupalchok)

  • Application Date: 2019-01-23
  • Installed Capacity : 0.998 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Sani Bheri Uttar Ganga Mini Hydroelectric Project

Taksera (Rukum)

  • Application Date: 2019-01-31
  • Installed Capacity : 0.998 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Ladku Mahankalthan HEP

  • Application Date: 2019-02-03
  • Installed Capacity : 0.85 MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Thaligad Small Hydroelectric Project

Dhap (Darchula)

  • Application Date: 2019-03-14
  • Installed Capacity : 0.7 MW
  • Phase : Application for Survey License
  • Type : Run-of-River