The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Live Hydropower Projects

mai khola

Khudi Khola Hydropower Project

Simpani, Lamjung

Khudi hydropower plant is located in Lamjung district in western region of Nepal. The project achieved its commercial operation in December 30, 2006. The power plant has two units of 2 MW each.
  • Commercial Operation Date : 2006-12-30
  • Installed Capacity : 4 MW
  • Phase : Live
  • Type : Run-of River
mai khola

Thopal Khola Hydropower Project

Dhading

  • Commercial Operation Date : 2007-08-09
  • Installed Capacity : 1.65 MW
  • Phase : Live
mai khola

Chameliya Khola Hydropower Project

Shikhar, Darchula

Chameliya Hydroelectric Project, 30 MW Jointly funded by Government of Nepal and Republic of Korea through Economic Development Corporation Fund
  • Commercial Operation Date : 2018-02-10
  • Installed Capacity : 30 MW
  • Phase : Live
  • Type : Peaking Run-of-River
mai khola

Mardi Khola Hydropower Project

Kaski

  • Commercial Operation Date : 2010-01-22
  • Installed Capacity : 4.8 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Ridi Khola Hydropower Project

Gulmi, Palpa

The Ridi Hydropower Project is a combination of irrigation and power generation operating from a run of river scheme. It is located in Ruru and Digam VDCs in Palpa district with an installed capacity of 2.4 MW and has been in operation since 2009.
  • Commercial Operation Date : 2009-10-27
  • Installed Capacity : 2.4 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Mai Khola Hydropower Project

Mai Khola Small Hydropower Project lies in Ilam District of Mechi Zone in Eastern Nepal. This 4.5 MW project has highly facilitated and hi-tech structures 48 m head works with radial hydraulic gate, 107 meter length desander 400 m open canal 750 m .3.1M dia tunnel in critical geology semi underground power house.
  • Commercial Operation Date : 2008-01-28
  • Installed Capacity : 4.5 MW
  • Phase : Live
  • Type : Run-of River
mai khola

Hewa Khola Small Hydropower Project

Sankhuwasabha

  • Commercial Operation Date : 2010-08-02
  • Installed Capacity : 4.45 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Lower Chaku Khola Hydropower Project

Sindhupalchok

  • Commercial Operation Date : 2013-08-08
  • Installed Capacity : 1.8 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Sipring Khola Hydroelectric Project

Gauri Shankher, Dolakha

  • Commercial Operation Date : 2013-01-16
  • Installed Capacity : 10 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Lower Modi 1 Hydropower Project

Khusma, Parbat

The project is run of the river project at Modi Khola of Parbat district. The construction of the project started in early 2010 and was completed in August 2012. The project started generating electricity since September 2012 with a connection to National Grid. The commercial operation of the project began in November 2012, since then the project is adding 61.01 GWh of energy annually to the national power network.
  • Commercial Operation Date : 2012-11-24
  • Installed Capacity : 10 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Siuri Small Hydropower Project

Lamjung

  • Commercial Operation Date : 2012-10-16
  • Installed Capacity : 5 MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Ankhu Khola 1 Hydropower Project

Dhading

Site is located in Dhading District close to 132 km from Kathmandu; Ankhu Khola is one of the major tributaries of Budhi Gandaki Nadi. The catchments area of Ankhu Khola is about 633 km2. The mean annual flow is estimated to be 58.38 cumecs. Previous capacity was 7MW which is now expanded to 8.4MW, with a design discharge of is 34.50m3/s.
  • Commercial Operation Date : 2013-08-24
  • Installed Capacity : 7 MW
  • Phase : Live
  • Type : Run-of River