The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Buku-Kapati Hydropower Project

Bhussinga,Rawadolu (Okhaldhunga) Goli (Solukhumbu)

  • Issue Date: 2017-08-24
  • Installed Capacity : 5 MW
  • Phase : Under Construction
mai khola

Super Nyadi Hydropower Project

Bahundada,Bhulbhule (Lamjung)

  • Issue Date: 2017-08-30
  • Installed Capacity : 40.27 MW
  • Phase : Under Construction
mai khola

Tinekhu Khola Small Hydropower Project

Jhyaku,Suriti (Dolakha)w

  • Issue Date: 2017-09-11
  • Installed Capacity : 099 MW
  • Phase : Under Construction
mai khola

Seti Khola Hydropower Project

Shivalaya (Parbat)

  • Issue Date: 2017-09-11
  • Installed Capacity : 3.5 MW
  • Phase : Under Construction
mai khola

Marsyangdi Besi Hydropower Project

Besisahar,Chandisthan,Bhulbhule,Gaunsahar,Bajhakhet,Hiletaxar (Lamjung)

  • Issue Date: 2017-09-17
  • Installed Capacity : 50 MW
  • Phase : Under Construction
mai khola

Upper Trishuli-1 Hydropower Project

Dhunche,Haku (Rasuwa)

  • Issue Date: 2017-11-09
  • Installed Capacity : 216 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Istul Khola Hydropower Project

Aarupokhari (Gorkha)

  • Issue Date: 2017-11-30
  • Installed Capacity : 1.506 MW
  • Phase : Under Construction
mai khola

Sapsup Khola Small Hydro Electric Project

Batase,Chhorambu,Rajapani (Khotang)

  • Issue Date: 2017-12-15
  • Installed Capacity : 7.151 MW
  • Phase : Under Construction
mai khola

Lapche Khola Hydropower Project

Lamabagar (Dolakha)

  • Issue Date: 2017-12-17
  • Installed Capacity : 160 MW
  • Phase : Under Construction
mai khola

Kasuwa Khola Hydropower Project

Makalu,Pathibhara (Sankhuwasabha)

The project is located in Makalu Gaupalika, of Sankhuwasabha District. Its registered office is located at Tripureshwor -11, Bluestar Complex, Kathmandu, Nepal. CEDB Hydro Fund Limited (CHF) holds sole ownership in the company.
  • Issue Date: 2017-12-18
  • Installed Capacity : 45 MW
  • Phase : Under Construction
mai khola

Richet Khola Small Hydropower Project

Manbu,Kashigaun (Gorkha)

  • Issue Date: 2017-12-19
  • Installed Capacity : 5 MW
  • Phase : Under Construction
mai khola

Saptang Khola Hydropower Project

Bungtang (Nuwakot)

  • Issue Date: 2018-01-05
  • Installed Capacity : 2.5 MW
  • Phase : Under Construction