The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Tila-2 Hydropower Project

Pakha (Kalikot)

  • Issue Date: 2018-08-24
  • Installed Capacity : 420 MW
  • Phase : Under Construction
mai khola

Upper Phawa Hydropower Project

Sikaicha,Tiringe (Taplejung)

  • Issue Date: 2018-09-04
  • Installed Capacity : 5.8 MW
  • Phase : Under Construction
mai khola

Hadi Khola (Sunkoshi) A Hydropower Project

Ghorthali,Karthali (Sindhupalchok)

  • Issue Date: 2018-09-10
  • Installed Capacity : 0.997 MW
  • Phase : Under Construction
mai khola

Super Aankhu Khola Hydropower Project

Lapa,Sirtung (Dhading)

The source river of the Super Aankhu Khola Hydropower Project is Ankhu khola which flows between Lapa and Sirtung VDCs of the Dhading District.
  • Issue Date: 2018-09-18
  • Installed Capacity : 25.4 MW
  • Phase : Under Construction
mai khola

Puwa II Hydropower Project

Sakhejung,Maipokhari,Barbote (Ilam)

  • Issue Date: 2018-10-09
  • Installed Capacity : 4.96 MW
  • Phase : Under Construction
mai khola

Nilgiri Khola-II cascade Project

Narchyang (Myagdi)

  • Issue Date: 2018-10-24
  • Installed Capacity : 62 MW
  • Phase : Under Construction
  • Type : Run-of River, Cascade
mai khola

Lower Manang Marsyangdi Hydropower Project

Tachi Bagarchhap,Dharapani,Thoche (Manang)

  • Issue Date: 2018-11-04
  • Installed Capacity : 140 MW
  • Phase : Under Construction
mai khola

Manang Marsyangdi Hydropower Project

Chame,Tachi Bagarchhap (Manang)

  • Issue Date: 2018-11-17
  • Installed Capacity : 282 MW
  • Phase : Under Construction
mai khola

Tauthali Khola Hydropower Project

Jethal,Pagretar,Petaku,Thulo Pakhar,Tauthali,Tekanpur (Sindhupalchok)

  • Issue Date: 2018-11-26
  • Installed Capacity : 0.95 MW
  • Phase : Under Construction
mai khola

Jadari Gad Hydropower Project

Matela,Lamatola,Malumela,Subeda (Bajhang)

  • Issue Date: 2018-12-09
  • Installed Capacity : 1 MW
  • Phase : Under Construction
mai khola

Salubyani Gad Small Hydropower Project

Kalukheti,Majhigau (Bajhang)

  • Issue Date: 2018-12-09
  • Installed Capacity : 0.233 MW
  • Phase : Under Construction
mai khola

Garchyang Khola Hydropower Project

Namarjung (Kaski)

  • Issue Date: 2018-12-04
  • Installed Capacity : 6.6 MW
  • Phase : Under Construction