The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Badigad (Kolti) Hydropower Project

Kolti,Kotila (Bajura)

  • Issue Date: 2018-12-02
  • Installed Capacity : 4.5 MW
  • Phase : Under Construction
mai khola

Upper Marsyangdi 1 Hydropower Project

Taghring,Khudi,Ghermu,Bahundada (Lamjung)

  • Issue Date: 2018-12-25
  • Installed Capacity : 138 MW
  • Phase : Under Construction
mai khola

Upper Lohore Small Hydropower Peoject

Baluwatar (Dailekh)

  • Issue Date: 2018-12-31
  • Installed Capacity : 4 MW
  • Phase : Under Construction
mai khola

Chameliya (Chhetigad) Hydropower Project

Ghusa,Guljar,Khandeswori,Sitaula (Darchula)

  • Issue Date: 2019-01-04
  • Installed Capacity : 85 MW
  • Phase : Under Construction
mai khola

Upper Piluwa Hills Small Hydropower Project

Nundhaki,Siddhakali (Sankhuwasabha)

  • Issue Date: 2019-01-07
  • Installed Capacity : 4.99 MW
  • Phase : Under Construction
mai khola

Middle Kaligandaki Hydropower Project

Myagdi

  • Application Date: 2018-08-28
  • Installed Capacity : 53.539 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Tamor Mewa Hydropower Project

Taplejung

  • Application Date: 2018-12-20
  • Installed Capacity : 128 MW
  • Phase : Under Construction
mai khola

Tinau Khola Hydropower Project

Palpa

  • Application Date: 2018-09-14
  • Installed Capacity : 3.440 MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Upper Ankhu Hydropower Project

Dhadhing

  • Application Date: 2018-11-27
  • Installed Capacity : 38 MW
  • Phase : Under Construction
mai khola

Upper Chameliya Hydropower Project

Darchula

  • Application Date: 2019-01-13
  • Installed Capacity : 40 MW
  • Phase : Under Construction
mai khola

Upper Irkhuwa Hydropower Project

Dobhane,Khatamma,Kudak Kaule (Bhojpur)

  • Application Date: 2018-09-23
  • Installed Capacity : 14.500 MW
  • Phase : Under Construction
mai khola

Upper Myagdi-I Hydroelectric Project

Bima,Marang,Takam,Muna,Mudi (Myagdi)

  • Application Date: 2018-11-26
  • Installed Capacity : 53.500 MW
  • Phase : Under Construction