The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Upper Suri Khola Hydropower Project

Chankhu (Dolakha)

  • Application Date: 2018-10-08
  • Installed Capacity : 7 MW
  • Phase : Under Construction
mai khola

Upper Richet Khola Small Hydropower Project

Kashigaun,Manbu (Gorkha)

  • Application Date: 2019-01-14
  • Installed Capacity : 2 MW
  • Phase : Under Construction
mai khola

Jurimba Khola Small Hydropower Project

Listi,Tatopani (Sindhupalchok)

  • Issue Date: 2014-08-31
  • Installed Capacity : 7.63 MW
  • Phase : Under Construction
mai khola

Jogmai Cascade

Namsaling (Ilam)

  • Issue Date: 2014-10-08
  • Installed Capacity : 6 MW
  • Phase : Under Construction
mai khola

Thulo Khola Hydropower Project

Kuinemangale (Myagdi)

  • Issue Date: 2015-10-02
  • Installed Capacity : 21.3 MW
  • Phase : Under Construction
mai khola

Chepe Khola HEP

Thalajung,Kerabari (Gorkha)

  • Issue Date: 2015-12-02
  • Installed Capacity : 7 MW
  • Phase : Under Construction
mai khola

Pegu Khola Small Hydropower Project

Bigu (Dolakha)

  • Issue Date: 2015-12-18
  • Installed Capacity : 4.35 MW
  • Phase : Under Construction
mai khola

Upper Midim Khola SHP

Upper Midim Khola SHP

  • Issue Date: 2016-06-20
  • Installed Capacity : 7.5 MW
  • Phase : Under Construction
mai khola

Lower Hewa Khola-A HPP

Bana,Baneswor,Chainpur,Jaljala (Sankhuwasabha)

  • Issue Date: 2016-06-19
  • Installed Capacity : 7.3 MW
  • Phase : Under Construction
mai khola

Bhim Khola Small HEP

Gwalichaur,Bhinggithe,Ranasinkiteni (Baglung)

  • Issue Date: 2016-06-24
  • Installed Capacity : 4.96 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Midim 1 HEP

  • Issue Date: 2017-05-24
  • Installed Capacity : 13.424 MW
  • Phase : Under Construction
mai khola

Mid Rawa Khola HEP

Baksila,Rakha Bangdel (Khotang)

  • Issue Date: 2017-06-09
  • Installed Capacity : 2.5 MW
  • Phase : Under Construction
  • Type : Run-of-the-river