The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Mid Solu Khola Hydropower Project

Gora Khami,Salleri (Solukhumbu)

  • Issue Date: 2017-07-21
  • Installed Capacity : 9.5 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Lower Balephi

Batase,Kubhinde,Fulpingkot,Fupingdandagau (Sindhupalchok)

  • Issue Date: 2017-08-09
  • Installed Capacity : 20 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Madya Super Daraundi HPP

  • Issue Date: 2017-09-01
  • Installed Capacity : 10 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Upper Piluwa 3 HPP

Mawadin,Siddhakali (Sankhuwasabha)

  • Issue Date: 2017-11-12
  • Installed Capacity : 4.95 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Lower Mid Rawa Khola HEP

Rakha Bangdel,Sapteswor (Khotang)

  • Issue Date: 2018-04-12
  • Installed Capacity : 4 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Menchet Khola HPP

Sirtung,Tipling (Dhading)

  • Issue Date: 2016-11-18
  • Installed Capacity : 7 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Seti Khola HPP

Ghachok,Machhapuchchhre,Purachaur,Sardikhola (Kaski)

  • Issue Date: 2017-04-21
  • Installed Capacity : 25 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Sunigad HEP

Sunikot (Bajhang)

  • Issue Date: 2017-05-24
  • Installed Capacity : 11.05 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Chepe Khola Small HEP

Kharibot (Gorkha) Dudhpokhari (Lamjung)

  • Issue Date: 2017-06-07
  • Installed Capacity : 8.63 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Mudi Khola Hydropower Project

Mudi (Myagdi)

  • Issue Date: 2017-07-21
  • Installed Capacity : 14.7 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Madme Khola HPP

Namarjung (Kaski)

  • Issue Date: 2017-07-30
  • Installed Capacity : 24 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Upper Maiwa HPP

Thinglabu,Phakumba,Sanghu,Dhungesaghu (Taplejung)

  • Issue Date: 2017-10-12
  • Installed Capacity : 17.85 MW
  • Phase : Under Construction
  • Type : Run-of-the-river