The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Mudi Khola Hydropower Project

Mudi (Myagdi)

  • Issue Date: 2017-07-21
  • Installed Capacity : 14.7 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Rauje Khola HPP

Takasindu (Solukhumbu)

  • Issue Date: 2017-08-25
  • Installed Capacity : 4.99 MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Lower jogmai Khola

1 2 3 4 Previous Next Salient Features Project Developed By Asian Hydropower Ltd. Lower Jogmai Khola Hydropower Project is a simple Run Off River type hydropower project located in Ilam District of eastern Nepal. The project lies at the end reach of Jogmai River within close proximity of Mai Beni Hydropower Project, where the river meets the Mai river. The Installed Capacity of the project is 6.2 MW. The project is easily accessible via multiple access roads at the moment. The easiest access is through a 3 km road from Mechi highway at Shilpur upto the powerhouse area. 33/132 kV Godak substation is only 4km away from the powerhouse for power evacuation.
  • Issue Date: 2019-06-27
  • Phase : Under Construction
  • Type : Run of River
mai khola

Tadi Khola

Nuwakot

  • Issue Date: 2011-09-21
  • Installed Capacity : 5 MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Chisang Khola -A Small HEP

Dhankuta,Morang

  • Application Date: 2019-03-17
  • Installed Capacity : 1.8 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Dudhkunda Khola HEP

Dhankuta,Morang

  • Application Date: 2019-03-19
  • Installed Capacity : 12 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Sagu khola 1 HPP

Dolakha

  • Application Date: 2016-07-26
  • Installed Capacity : 5.5 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Upper Machha Khola HEP

Gorkha

  • Application Date: 2017-03-05
  • Installed Capacity : 4.550 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Kabeli B1 Cascade HPP

Ambarpur,Nagi (Panchthar)

  • Application Date: 2019-01-24
  • Installed Capacity : 9.940 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Sagu Khola HEP

  • Application Date: 2019-04-11
  • Installed Capacity : 20 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Landruk Modi HEP

Lumle,Ghandruk,Lwangghale (Kaski)

  • Application Date: 2019-05-20
  • Installed Capacity : 86.590 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Middle Mewa HPP

Liwang,Sanwa,Nalbu,Papung,Thukima (Taplejung)

  • Issue Date: 2016-12-20
  • Installed Capacity : 49 MW
  • Phase : Under Construction
  • Type : Run-of-the-river