The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Lohare Khola Hydropower Project

Baluwatar,Nomule,Salleri,Toli (Dailekh)

  • Issue Date: 2013-09-24
  • Installed Capacity : 4.2 MW
  • Phase : Under Construction
mai khola

Salankhu Khola Hydropower Project

Kaule,Manakamana,Tupche,Fikuri (Nuwakot)

  • Issue Date: 2013-10-22
  • Installed Capacity : 2.5 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Madhya Bhotekoshi Hydropower Project

Maneswor,Marbin,Listi (Sindhupalchok)

  • Issue Date: 2012-10-03
  • Installed Capacity : 102 MW
  • Phase : Under Construction
mai khola

Rawa Khola Hydropower Project

Hauchour,Jalapa,Dumekoldada (Khotang)

  • Issue Date: 2014-02-11
  • Installed Capacity : 6.5 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Down Piluwa Hydropower Project

Baneswor,Ankhibhui,Mamling (Sankhuwasabha)

  • Issue Date: 2014-02-16
  • Installed Capacity : 9.5 MW
  • Phase : Under Construction
mai khola

Super Dordi Kha Hydropower Project

Dhodeni,Faleni (Lamjung)

  • Issue Date: 2014-03-05
  • Installed Capacity : 49.6 MW
  • Phase : Under Construction
mai khola

Lower Solu Hydropower Project

Garma,Tingla (Solukhumbu)

  • Issue Date: 2013-02-19
  • Installed Capacity : 82 MW
  • Phase : Under Construction
mai khola

Upper Myagdi Hydropower Project

Marang,Mudi,Muna (Myagdi)

  • Issue Date: 2013-02-20
  • Installed Capacity : 20 MW
  • Phase : Under Construction
mai khola

Rupse Khola Hydropower Project

Dana (Myagdi)

  • Issue Date: 2014-04-18
  • Installed Capacity : 4 MW
  • Phase : Under Construction
mai khola

Upper Dordi A Hydroelectric Project

Dhodeni,Faleni (Lamjung)

  • Issue Date: 2014-04-28
  • Installed Capacity : 25 MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Khare Hydropower Project

Chankhu,Khare,Marbu (Dolakha)

  • Issue Date: 2014-05-04
  • Installed Capacity : 24.1 MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Maya Khola Hydropower Project

Mamling,Madi Rambeni,Baneswor (Sankhuwasabha)

  • Issue Date: 2014-06-09
  • Installed Capacity : 14.9 MW
  • Phase : Under Construction