The Nepal Water Resource Portal provides a complete picture of Nepal’s water resources and its varied uses. It is a database of all major and minor rivers and river basins along with operational, under construction and under survey hydropower projects on these rivers. In addition, the website includes irrigation projects and groundwater level across the country, giving a spatial representation of Nepal’s water resource and its utilities.


The team working on the portal was inspired by the lack of composite information on how water resources are used or at times even exploited. This portal, therefore, provides a tool to analyze water resources and the development of a region. It uses GIS to locate the infrastructure projects on each river, within the administrative boundaries along with the salient features of those projects, bringing to light the developmental trajectory of our rivers.

Under Construction Hydropower Projects

mai khola

Jeuli Gad Hydropower Project

Chainpur,Rithapata (Bajhang)

  • Issue Date: 2015-07-07
  • Installed Capacity : 0.996 MW
  • Phase : Under Construction
mai khola

Ghatte Khola Hydropower Project

Marbu (Dolakha)

  • Issue Date: 2015-07-09
  • Installed Capacity : 5 MW
  • Phase : Under Construction
mai khola

Tanchhahara Small Hydropower Project

Kowang,Lete (Mustang)

  • Issue Date: 2015-08-14
  • Installed Capacity : 2.4 MW
  • Phase : Under Construction
mai khola

Langtang Khola Small Hydropower Project

Syafru (Rasuwa)

  • Issue Date: 2015-09-18
  • Installed Capacity : 20 MW
  • Phase : Under Construction
mai khola

Siddhi Khola Hydropower Project

Samalpung,Jirmale (Ilam)

  • Issue Date: 2015-09-30
  • Installed Capacity : 10 MW
  • Phase : Under Construction
mai khola

Upper Tadi Hydropower Project

Rautbesi (Nuwakot)

  • Issue Date: 2015-09-10
  • Installed Capacity : 11 MW
  • Phase : Under Construction
mai khola

Likhu -1 Hydropower Project

Gumdel (Ramechhap)

  • Issue Date: 2015-10-09
  • Installed Capacity : 77 MW
  • Phase : Under Construction
mai khola

Likhu -2 Hydropower Project

Gumdel (Ramechhap) Chaulakharka(Waula) (Solukhumbu)

  • Issue Date: 2015-10-09
  • Installed Capacity : 55 MW
  • Phase : Under Construction
mai khola

Ruru Banchu - 1 Hydropower Project

Chilkhaya,Odanku (Kalikot)

  • Issue Date: 2015-10-09
  • Installed Capacity : 16 MW
  • Phase : Under Construction
mai khola

Likhu Khola 'A' Hydropower Project

Chaulakharka(Waula),Goli (Solukhumbu)

  • Issue Date: 2015-11-02
  • Installed Capacity : 51 MW
  • Phase : Under Construction
mai khola

Upper Piluwa Khola-2 Small Hydropower Project

Mawadin,Siddhakali (Sankhuwasabha)

  • Issue Date: 2015-12-18
  • Installed Capacity : 4.72 MW
  • Phase : Under Construction
mai khola

Singati Khola Hydropower Project

Babare,Laduk,Lamidada (Dolakha)

  • Issue Date: 2016-01-14
  • Installed Capacity : 25 MW
  • Phase : Under Construction