Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
The Charanawoti Hydro electrical Project (CHP) is located in Bhimeshwor Municipality ward no 8, 9 & 11, Katakuti VDC Ward No. 06, and Magapauwa VDC Ward No. 05 of Dolakha District in the Central Development Region of Nepal. This project is located 15 km East of Charikot city. Geographically, the basin is located between latitudes 27º37'50" and 27º39'20" and between longitude 86º00'58" and 86º02'35.5". The river basin extends up to 7555 masl. The annual generation of energy is 20.383 GWh with an installed capacity of 3.520 MW.
Design Discharge | 2.19 m3/s |
---|---|
Maximum Gross Head | 199m |
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live