Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
Dordi Khola Hydropower Project is a Run-of-River type hydroelectric project with generating capacity of 27 MW. The project is being developed by Himalayan Power Partner Ltd. (HPPL) Kathmandu, Nepal. HPPL is promoted by IME Group and later joined by NRN Investment Ltd. to develop Dordi Khola HPP with equity sharing in 49:51 ratios. This is the first corporate investment of Non Resident Nepalese (NRN) in Nepal. Feasibility Study of the Project was completed in March 2010. Detail Project Report (DPR) is prepared by international consultant Entura Hydro Tasmania.
Catchment Area | 277 km 2 |
---|---|
Design Discharge | 15.28 m 3 /s |
Maximum Net Head | 203.32 m |
Maximum Gross Head | 214 m |
Headrace Tunnel-Length | 2662 m |
---|---|
Penstock- Length | 700 m |
Penstock-Diameter | 2.3 m |
Tailrace Canal Length | 300 m |
Type | Horizontal axis Francis turbine |
---|---|
Rated Output | 3 X 9 MW |
Rated Capacity | 3 x 10590 kVA |
---|---|
Type | Synchronous Three Phase |
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live