https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Kaligandaki Upper Hydropower Project

Gwh/yr

Energy Generation

65MW

Installed Capacity

Salient Features

Hydrology ( Intake )

Catchment Area 4090 km2
Design Discharge 55.03 m3/s
Maximum Net Head 139.09 m
Maximum Gross Head 150 m

Waterways

Headrace Tunnel-Length 6158 m
Penstock- Length 123.44 m
Penstock-Diameter 4.5 m
Tailrace Canal Length 249.41 m

Turbine

Type Vertical axis Francis turbine
Rated Output 2 X 32.5 MW

Generators

Rated Capacity 38.24 MVA
Type Three Phase Synchronous
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live

Location