| Catchment Area | 150 km 2 |
|---|---|
| Design Discharge | 8.43 m 3 /s |
| Headrace Tunnel-Length | 4796 m |
|---|---|
| Penstock- Length | 870 m, (771.66m up to Manifold) |
| Penstock-Diameter | 2 m for first 30 m and 1.7 m in the remaining portion |
| Type | Vertical Axis Pelton |
|---|---|
| Number of Units | 2 |
| Rated Discharge | 4.215 m³/sec |
| Rated Output | 24.1 MW |
| Number of Generators | 2 |
|---|---|
| Rated Capacity | 0.85 |
| Type | Synchronous Three phase |