https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Lower Modi Khola Hydropower Project

Gwh/yr

Energy Generation

20MW

Installed Capacity

About

MEL is developing 20 MW Lower Modi Khola Hydroelectric Project, located in Parbat District. The annual generation of energy is 117 GWh. The project is under construction.The Lower Modi Hydroelectric Project (LMHEP) is located in Deopur, Bajung, Tilahar,Durlung and Chuwa Village Development Committee of Parbat District in the Western Development Region of Nepal.

Salient Features

Hydrology ( Intake )

Catchment Area 560 km2

Waterways

Headrace Tunnel-Length 4,021 m
Penstock- Length 454 m
Penstock-Diameter 3.5 m
Tailrace Canal Length 44 m

Turbine

Type Vertical Axis, Francis
Number of Units 2
Rated Output 2 x 10000 kW

Generators

Number of Generators 2
Power Factor 0.8

Transformers

Number of Units 2
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live

Location