MEL is developing 20 MW Lower Modi Khola Hydroelectric Project, located in Parbat District. The annual generation of energy is 117 GWh. The project is under construction.The Lower Modi Hydroelectric Project (LMHEP) is located in Deopur, Bajung, Tilahar,Durlung and Chuwa Village Development Committee of Parbat District in the Western Development Region of Nepal.
Catchment Area | 560 km2 |
---|
Headrace Tunnel-Length | 4,021 m |
---|---|
Penstock- Length | 454 m |
Penstock-Diameter | 3.5 m |
Tailrace Canal Length | 44 m |
Type | Vertical Axis, Francis |
---|---|
Number of Units | 2 |
Rated Output | 2 x 10000 kW |
Number of Generators | 2 |
---|---|
Power Factor | 0.8 |
Number of Units | 2 |
---|