
Application for Survey License

Survey License Approved

Application for Generation License

Under Construction

Live
Catchment Area | 3700 km2 |
---|---|
Design Discharge | 44.98 m3/s |
Maximum Net Head | 138.35 |
Maximum Gross Head | 144 m |
Headrace Tunnel-Length | 4184 m |
---|
Type | Vertical axis Francis |
---|---|
Number of Units | 2 |
Rated Capacity | 26.80 MW |
Number of Generators | 2 |
---|---|
Power Factor | 0.9 |
Type | Synchronous Three phase |
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live