Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
Rudi Khola - B Hydroelectric Project is a run-of-River (RoR) type project and is proposed to be developed by Bindhyabasini Hydropower Development Company Ltd., with an installed capacity of 6.6 MW with 300 m net head and 2.5 m3/s (cumec) design discharge at Q40%. This project is being developed in tandem with Rudi Khola - A Hydroelectric Project (8.8 MW) in cascade system.
| Catchment Area | Karbu 11.4, Targo 12.4, Kaiyu 5.4, Ligur 6.1 km2 |
|---|---|
| Design Discharge | 2.55 cumecs |
| Maximum Gross Head | 310.85 m |
| Penstock- Length | 633.43 m |
|---|
| Type | Pelton |
|---|---|
| Number of Units | 2 |
| Rated Discharge | 1.275 m3/s |
| Number of Generators | 3 ph AC Synchronous |
|---|---|
| Power Factor | 0.80 |
| Type | 2 |
| Number of Units | 1 |
|---|