77.61 GWhGwh/yr

Energy Generation

13.5MW

Installed Capacity

About

The Proposed Super Kabeli Khola A Hydropower Project is a run-of- river type project with major components comprising of diversion weir, intake, gravel trap, approach culvert, settling basin, head race pipe, head race tunnel, surge pipe, steel penstock pipe, powerhouse and tailrace. The project consist of Headworks arrangement at Barule village. The proposed weir crest level is at an elevation 2252.00 meter above msl. The crest of the 24.50 m long diversion weir is about 2.0 m above the bed level of the river

Salient Features

Data not found

check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live