https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Tinau Hydropower

Gwh/yr

Energy Generation

1.024MW

Installed Capacity

About

Tinau was commissioned in 1978 near Butwal, but was recommissioned in 1983 after repair of flood damage. The project features two 250-kW turbine-generators, a 500-kW unit, a 2.4-kilometer tunnel, underground desilting chamber, and powerhouse.

Salient Features

Hydrology ( Intake )

Minimum Daily Discharge 2.4 m3 /s
Design Discharge 2.5 m3 /s
Maximum Daily Discharge 54 m3 /s

Waterways

Penstock- Length 50 m
Penstock-Diameter 1.275 m
Total Length of Tunnel 2,462 m

Turbine

Type Francis
Number of Units 3

Generators

Number of Generators 3
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live