https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Trishuli Hydropower Station

163Gwh/yr

Energy Generation

24MW

Installed Capacity

About

Trishuli Hydropower Station, located at Trishuli, Nuwakot, previously with an installed capacity of 21 MW consisting of 7 units each of 3 MW commissioned in 1967 AD and developed jointly by Government of India and Government of Nepal at a cost of INR 140 million. It was rehabilitated in 1995 AD and upgraded to 24 MW with 6 units each of 3.5 MW and one unit of 3 MW. It is a peaking run-of-river hydropower station with annual design generation of 163 GWh. The power station is in continuous operation since commissioned around forty-five (45) years ago. The cumulative generation of Trishuli HPS has reached 4,449.31 GWh till 2011/12 from its first run. The station has generated 128.25 GWh in FY 2010/11 and 134.77 GWh in FY 2011/12 with an increase of 5.09%. The generation from this station contributed 3.23 % of the total energy in the INPS in 2011/12.

Salient Features

Hydrology ( Intake )

Catchment Area 2600km2
Maximum Net Head 51.4 m
Average Annual Discharge 45.66 m3/s

Head Works (Intake)

Diversion Length 139.6m

Waterways

Penstock – Length 71.66m
Penstock -Diameter 2.3m
Total Length of Waterways 4,792m

Turbine

Type Francis
Number of Units 7
Rated Capacity 3,620 kW

Generators

Rated Capacity 3889 kVA
Power Factor 0.9

Transformers

Number of Units 6 (5 MVA, 6.6/66 kV, single phase)
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live