Gwh/yr

Energy Generation

4.36MW

Installed Capacity

About

The Tungun-Thosne Hydropower Project is located about 25 km from the Ring Road of Kathmandu and is easily accessible via Tikabhairavand KantiLokpath. The project is a cascade project where the water of Tungun River is diverted to Thosne River after which the first stage generation of 4.360 MW is achieved. The tailrace water from the first stage generation yields the generation of 2 MW which is produced by the Khani Khola Hydropower Project.

Salient Features

Waterways

Headrace Tunnel-Length 751 m
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live

Location