Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
The Tungun-Thosne Hydropower Project is located about 25 km from the Ring Road of Kathmandu and is easily accessible via Tikabhairavand KantiLokpath. The project is a cascade project where the water of Tungun River is diverted to Thosne River after which the first stage generation of 4.360 MW is achieved. The tailrace water from the first stage generation yields the generation of 2 MW which is produced by the Khani Khola Hydropower Project.
Headrace Tunnel-Length | 751 m |
---|
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live