138.398 GWhGwh/yr

Energy Generation

25MW

Installed Capacity

Salient Features

Hydrology ( Intake )

Catchment Area 191.30 km²
Design Discharge g.8o m3/s
Maximum Net Head 299.31 m
Maximum Gross Head 325.56 m

Head Works (Intake)

Diversion Height 4 m above natural bed
Diversion Length 2.0 m

Waterways

Headrace Tunnel-Length 2632 m
Penstock- Length 3140 m
Penstock-Diameter 1.9 m

Powerhouse

Power House Surface
Design Head 40m.20m-11m

Turbine

Type Horizontal Shaft Pelton Turbine
Rated Output 2*12.5 MW

Generators

Rated Capacity 2"14.7 MVA
Type 3 phase synchronous

Transformers

Number of Units 2
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live

Location