Gwh/yr

Energy Generation

25MW

Installed Capacity

About

The 25-MW Upper Madi hydropower project, owned jointly by a China-Nepal venture, started generating power in Kaski district in western Nepal, in Dec 2016. The project construction, which was primarily estimated to cost around Rs 5.28 billion, saw an increase in investment to Rs 8 billion due to trade blockade, earthquake and other natural calamities. The construction started from mid-December 2012 and completed at the end of December 2016. China International Water & Electric Co. (CWE) financed the project under the build, own, operate and transfer model together with Nepalese investor Bijay Babu Malla.

Salient Features

Hydrology ( Intake )

Catchment Area 375 km2
Maximum Net Head 119.78 m
Maximum Gross Head 124.09 m

Waterways

Headrace Tunnel-Length 3920 m
Penstock- Length 158.10 m
Penstock-Diameter 3.20 m
Penstock – Length 116 m

Turbine

Type Vertical axis Francis turbine
Rated Capacity 12.5 MW
Rated Output 10.2 KW

Generators

Rated Capacity 9600 KW
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live