Upper Trishuli-1 Hydroelectric Project is a ROR scheme in Trishuli River with 216 MW installed capacity. The total annual gross energy production of UT-1 is 1533.06 GWh. The project consists of a 29.5m high Dam, Underground Desander, a 9.8 km long Headrace Tunnel (HRT), Surge Tank and an Underground Power House as the main structures.