mai khola

Middle Kaligandaki Hydropower Project

Myagdi

  • Application Date: 2018-08-28
  • Installed Capacity : 53.539MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Super Mai Khola Cascade Hydropower Project

Illam

  • Application Date: 2018-11-21
  • Installed Capacity : 3.8MW
  • Phase : Live
  • Type : Run-of-River, Cascade
mai khola

Tamor Mewa Hydropower Project

Taplejung

  • Application Date: 2018-12-20
  • Installed Capacity : 128MW
  • Phase : Under Construction
mai khola

Tinau Khola Hydropower Project

Palpa

  • Application Date: 2018-09-14
  • Installed Capacity : 3.440MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Upper Ankhu Hydropower Project

Dhadhing

  • Application Date: 2018-11-27
  • Installed Capacity : 38MW
  • Phase : Under Construction
mai khola

Upper Budhiganga B Hydropower Project

Bajura

  • Application Date: 2019-01-19
  • Installed Capacity : 8.4MW
  • Phase : Application for Generation License
mai khola

Upper Chameliya Hydropower Project

Darchula

Upper Chameliya Hydroelectric Project is a run-off-river type project located Lattinath, Guljar and Tapoban VDC's of Darchula district, Mahakali zone, Far Western Region of Nepal. This Project Utilizes the 40% probability discharge of 22.79 m3/s with gross head of 215m to generate 40 MegaWatt power. The generated power will be evacuated through 16 km long, 132kV double circuit transmission line from project switchyard to Balanch Substation. The Intake and Weir is proposed downstream of the confluence of Rugru Gad and Chameliya river at Guljar VDC. Major Structures of the Project are Diversion Weir & Intake, Settling Basin, Headrace Pipe, Surge Tank, Penstock Pipe, Powerhouse and Tailrace canal. The Powerhouse site is proposed at Lama Bagar of Lattinath VDC, Darchula district just u/s the confluence of Odkhet Khola and Chameliya river. The whole alignment runs along the left bank of the river.
  • Application Date: 2019-01-13
  • Installed Capacity : 40 MWMW
  • Phase : Live
  • Type : Run-of-river
mai khola

Upper Irkhuwa Hydropower Project

Dobhane,Khatamma,Kudak Kaule (Bhojpur)

  • Application Date: 2018-09-23
  • Installed Capacity : 14.500MW
  • Phase : Under Construction
mai khola

Upper Myagdi-I Hydroelectric Project

Bima,Marang,Takam,Muna,Mudi (Myagdi)

  • Application Date: 2018-11-26
  • Installed Capacity : 53.500MW
  • Phase : Under Construction
mai khola

Upper Suri Khola Hydropower Project

Chankhu (Dolakha)

  • Application Date: 2018-10-08
  • Installed Capacity : 7MW
  • Phase : Under Construction
mai khola

Upper Richet Khola Small Hydropower Project

Kashigaun,Manbu (Gorkha)

  • Application Date: 2019-01-14
  • Installed Capacity : 2MW
  • Phase : Under Construction
mai khola

Hudi Khola Small Hydropower Project

  • Application Date: 2018-04-05
  • Installed Capacity : 0.66MW
  • Phase : Application for Survey License
  • Type : Run-of-River