https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Hydropower

Hydropower Projects

mai khola

Upper Maiwa HPP

Thinglabu,Phakumba,Sanghu,Dhungesaghu (Taplejung)

  • Issue Date: 2017-10-12
  • Installed Capacity : 17.85MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Sona Khola Hydropower Project

Papung (Taplejung)

  • Issue Date: 2017-10-11
  • Installed Capacity : 5MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Dudh Khola Small HPP

Dhodeni (Lamjung)

  • Issue Date: 2017-10-10
  • Installed Capacity : 5MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lomsa HEP

Syama (Dolakha)

  • Issue Date: 2017-10-04
  • Installed Capacity : 1.1MW
  • Phase : Application for Generation License
  • Type : Run-of-the-river
mai khola

Palun khola small Hydropower Project

Papung (Taplejung)

  • Issue Date: 2017-09-17
  • Installed Capacity : 21MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Sani Bheri-2 HEP

Pokhara,Kanda,Sobha (Rukum)

  • Issue Date: 2017-09-17
  • Installed Capacity : 23.31MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Upper Sunigad HEP

Dilichaur (Bajhang)

  • Issue Date: 2017-09-17
  • Installed Capacity : 8.42MW
  • Phase : Survey License Approved
  • Type : 8.42
mai khola

Tadi Ghyamphedi HPP

Dhyangphedi (Nuwakot)

  • Issue Date: 2017-09-11
  • Installed Capacity : 8MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Tallo Bagmati Small HPP

Ipa Panchakanya (Makawanpur)

  • Issue Date: 2017-09-08
  • Installed Capacity : 8.5MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Upper Mudi HEP

Mudi (Myagdi)

  • Issue Date: 2017-09-06
  • Installed Capacity : 12.73MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Rolwaling Khola

Lamabagar (Dolakha)

  • Issue Date: 2017-09-06
  • Installed Capacity : 22MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Palun khola 1 Hydropower Project

Papung (Taplejung)

  • Issue Date: 2017-09-01
  • Installed Capacity : 4.95MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river