Hydropower Projects

mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200MW
  • Phase : Survey License Approved
mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Tamor Storage

Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E

  • Issue Date: 2013-07-31
  • Installed Capacity : 200MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Lower jogmai Khola

1 2 3 4 Previous Next Salient Features Project Developed By Asian Hydropower Ltd. Lower Jogmai Khola Hydropower Project is a simple Run Off River type hydropower project located in Ilam District of eastern Nepal. The project lies at the end reach of Jogmai River within close proximity of Mai Beni Hydropower Project, where the river meets the Mai river. The Installed Capacity of the project is 6.2 MW. The project is easily accessible via multiple access roads at the moment. The easiest access is through a 3 km road from Mechi highway at Shilpur upto the powerhouse area. 33/132 kV Godak substation is only 4km away from the powerhouse for power evacuation.
  • Issue Date: 2019-06-27
  • Phase : Under Construction
  • Type : Run of River
mai khola

Tadi Khola

Nuwakot

  • Issue Date: 2011-09-21
  • Installed Capacity : 5MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Thoppal Khola Hydropower Project

Dhading

  • Commercial Operation Date : 2007-08-09
  • Installed Capacity : 1.650MW
  • Phase : Live
  • Type : Run-of-River
mai khola

Super Mai Hydropower Project

Illam

  • Commercial Operation Date : 2018-10-28
  • Installed Capacity : 7.8MW
  • Phase : Live
mai khola

Chisang Khola -A Small HEP

Dhankuta,Morang

  • Application Date: 2019-03-17
  • Installed Capacity : 1.8MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Dudhkunda Khola HEP

Dhankuta,Morang

  • Application Date: 2019-03-19
  • Installed Capacity : 12MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Tiplyang Kaligandaki HEP

  • Application Date: 2019-03-25
  • Installed Capacity : 58MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Sagu khola 1 HPP

Dolakha

  • Application Date: 2016-07-26
  • Installed Capacity : 5.5MW
  • Phase : Under Construction
  • Type : Run Of River