https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Hydropower

Hydropower Projects

mai khola

Upper Machha Khola HEP

Gorkha

  • Application Date: 2017-03-05
  • Installed Capacity : 4.550MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Kabeli B1 Cascade HPP

Ambarpur,Nagi (Panchthar)

  • Application Date: 2019-01-24
  • Installed Capacity : 9.940MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Upper Daraudi Hydropower Project

Ghyalchok,Simjung,Saurpani (Gorkha)

  • Application Date: 2019-04-03
  • Installed Capacity : 9.200MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Sagu Khola HEP

  • Application Date: 2019-04-11
  • Installed Capacity : 20MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Aayu Malun Khola HEP

Okhaldhunga

  • Application Date: 2019-04-26
  • Installed Capacity : 21MW
  • Phase : Survey License Approved
  • Type : Run Of River
mai khola

Landruk Modi HEP

Lumle,Ghandruk,Lwangghale (Kaski)

  • Application Date: 2019-05-20
  • Installed Capacity : 86.590MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Lower Barun Khola HPP

Hatiya (Sankhuwasabha)

  • Application Date: 2019-06-06
  • Installed Capacity : 132MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Uttarganga Storage Hydropower Project

Bowang,Boharagaun,Nisi,Adhikarichaur (Baglung)

  • Application Date: 2019-07-02
  • Installed Capacity : 828MW
  • Phase : Application for Generation License
  • Type : Run Of River
mai khola

Upper Balefhi

Golche,Gumba (Sindhupalchok)

  • Issue Date: 2008-06-16
  • Installed Capacity : 46MW
  • Phase : Application for Generation License
  • Type : Run-of-the-river
mai khola

Botekoshi 5 HEP

Ramche,Tekanpur,Gati,Barhabise,Maneswor,Mankha (Sindhupalchok)

  • Issue Date: 2012-11-11
  • Installed Capacity : 62MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Myagdi Khola Hydropower Project

Mudi (Myagdi)

  • Issue Date: 2015-01-18
  • Installed Capacity : 57.3MW
  • Phase : Application for Generation License
  • Type : Run-of-the-river
mai khola

Isuwa Khola Hydropower Project

Makalu (Sankhuwasabha)

  • Issue Date: 2015-02-16
  • Installed Capacity : 97.2MW
  • Phase : Under Construction
  • Type : Run-of-the-river