Hydropower Projects

mai khola

Upper Tadi Hydropower Project

Rautbesi (Nuwakot)

  • Issue Date: 2015-09-10
  • Installed Capacity : 11MW
  • Phase : Under Construction
mai khola

Likhu -1 Hydropower Project

Gumdel (Ramechhap)

  • Issue Date: 2015-10-09
  • Installed Capacity : 77MW
  • Phase : Under Construction
mai khola

Likhu -2 Hydropower Project

Gumdel (Ramechhap) Chaulakharka(Waula) (Solukhumbu)

  • Issue Date: 2015-10-09
  • Installed Capacity : 55MW
  • Phase : Under Construction
mai khola

Ruru Banchu - 1 Hydropower Project

Chilkhaya,Odanku (Kalikot)

  • Issue Date: 2015-10-09
  • Installed Capacity : 16MW
  • Phase : Under Construction
mai khola

Likhu Khola 'A' Hydropower Project

Chaulakharka(Waula),Goli (Solukhumbu)

  • Issue Date: 2015-11-02
  • Installed Capacity : 51MW
  • Phase : Under Construction
mai khola

Upper Piluwa Khola-2 Small Hydropower Project

Mawadin,Siddhakali (Sankhuwasabha)

  • Issue Date: 2015-12-18
  • Installed Capacity : 4.72MW
  • Phase : Under Construction
mai khola

Singati Khola Hydropower Project

Babare,Laduk,Lamidada (Dolakha)

  • Issue Date: 2016-01-14
  • Installed Capacity : 25MW
  • Phase : Under Construction
mai khola

Idi Khola Small Hydropower Project

Thumakodada,Saimrang (Kaski)

  • Issue Date: 2016-03-14
  • Installed Capacity : 0.975MW
  • Phase : Under Construction
mai khola

Kalanga Hydropower Project

Sunkuda,Khiratadi,Banjh (Bajhang)

Kalanga Gad Hydro Electric Project of 15.33 MW capacity, is a run-of-river type project located in Sunkuda and Khiratadi VDCs of Bajhang district of Seti Zone of Far – Western Region of Nepal. The description of various aspects of the project including climatic conditions, hydrology, sedimentology, geology, of the project site etc.
  • Issue Date: 2016-03-27
  • Installed Capacity : 15.33MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Upper Kalangad Hydropower Project

Dahabagar,Khiratadi (Bajhang)

  • Issue Date: 2016-03-27
  • Installed Capacity : 38.46MW
  • Phase : Under Construction
mai khola

Sanigad Hydropower Project

Kaphalaseri,Pipalkot (Bajhang)

  • Issue Date: 2016-03-27
  • Installed Capacity : 10.7MW
  • Phase : Under Construction
mai khola

Lower Likhu Hydropower Project

Tarkerabari,Yasam,Gamanamatar (Okhaldhunga) Bijulikot,Gothgau (Ramechhap)

Lower Likhu Hydropower Project (LLHP) is a run-of-river (RoR) hydropower project with an installed capacity of 28.1 MW. The entire project area (headworks to power house) is located at Sirise, Saipu and Bijulikot VDCs of Ramechhap District, Central Development Region of Nepal. Geographically, the project lies between 86˚ 14’ 58” E to 86˚ 13’ 17” E and 27˚ 25’ 50” N to 27˚ 22’ 47” N. The project’s headworks is located at the right bank of Likhu Khola, Sirise Village of Sirise VDC at some 200m upstream from the confluence of Pokali and Likhu Khola. Whereas, power house is located at the right bank of Likhu khola, Ratamata. The latitude and longitude of powerhouse is 27˚ 23’ 27” N and 86˚ 13’ 44” E respectively. The generated power of 28.1 MW will be evacuated through approximately 23 km of transmission line and will be connected to Integrated Nepal Power System (INPS) at Nepal Electricity Authority’s proposed New Khimti Substation at Devitar.
  • Issue Date: 2016-04-10
  • Installed Capacity : 28.1MW
  • Phase : Under Construction
  • Type : Run of River