Hydropower Projects

mai khola

ChulepuKhola Hydropower Project

Bhujee,Guptesqor,Pritee (Ramechhap)

  • Issue Date: 2016-04-25
  • Installed Capacity : 8.52MW
  • Phase : Under Construction
mai khola

Chauri Khola Hydropower Project

Goswara (Ramechhap)

  • Issue Date: 2016-04-26
  • Installed Capacity : 5MW
  • Phase : Under Construction
mai khola

Tanahu Hydroelectric Project

Damauli,Kahu Sivapur (Tanahu)

Tanahu Hydropower Limited (THL) is a subsidiary company of Nepal Electricity Authority (NEA) established in 2012 to develop 140 MW Tanahu Hydropower Project ("the Project") (formerly, Upper Seti (Damauli) Storage Hydroelectric Project). The Project site is situated 150 km west of Kathmandu on Seti River near Damauli of Tanahu District in Gandaki Zone. The project is a storage type plant capable of supplying peak power for minimum of 6 hours daily. The power will be evacuated through a 40 km long 220 kV double circuit transmission line to New Bharatpur sub-station.
  • Issue Date: 2016-05-16
  • Installed Capacity : 140MW
  • Phase : Under Construction
mai khola

Daraundi-1 Hydropower Project

Takumajhlakuribot,Takukot,Masel,Jaubari,Gakhu,Shreenathkot (Gorkha)

  • Issue Date: 2016-06-08
  • Installed Capacity : 10MW
  • Phase : Under Construction
mai khola

Taksar Pikhuwa Hydropower Project

Kota,Mane Bhanjyang,Taksar,Dalgaun (Bhojpur)

  • Issue Date: 2016-06-17
  • Installed Capacity : 8MW
  • Phase : Under Construction
mai khola

Sanjen Khola Hydropower Project

Chilime (Rasuwa)

  • Issue Date: 2016-06-23
  • Installed Capacity : 78MW
  • Phase : Under Construction
mai khola

Phalakhu Khola Hydropower Project

Bhorle,Saramthali (Rasuwa)

  • Issue Date: 2016-07-08
  • Installed Capacity : 5MW
  • Phase : Under Construction
mai khola

Phalakhu Khola Hydropower Project

Saramthali,Yarsa (Rasuwa)

  • Issue Date: 2016-07-25
  • Installed Capacity : 14.7MW
  • Phase : Under Construction
mai khola

Upper Balephi A Hydropower Project

Golche,Pangtang,Dhumthang (Sindhupalchok)

Upper BalephiA Hydropower Project (36MW),is a Run of River type of hydropower project with an installed capacity of 36,000kW. Project headworks is on 1400 msl which collects water from 440.2 km2 catchment areawith design flow Q40% of time is 20.83 m3/sec and 208 m gross head head. Currently 50% of the project has been completed and it is right on schedule to meet the COD Feb 2020.
  • Issue Date: 2016-07-27
  • Installed Capacity : 36MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Liping Khola Hydropower Project

Tatopani (Sindhupalchok)

  • Issue Date: 2016-07-27
  • Installed Capacity : 16.26MW
  • Phase : Under Construction
mai khola

Lower Khorunga Hydropower Project

Jaljale,Tamfula (Terhathum)

  • Issue Date: 2016-07-27
  • Installed Capacity : 5.5MW
  • Phase : Under Construction
mai khola

Lower Chhote Khola Small Hydropower Project

Manbu (Gorkha)

  • Issue Date: 2016-07-31
  • Installed Capacity : 0.997MW
  • Phase : Under Construction