Hydropower Projects

mai khola

Middle Tara Khola Small Hydropower Project

Tara (Baglung)

  • Issue Date: 2017-03-26
  • Installed Capacity : 1.7MW
  • Phase : Under Construction
mai khola

Balephi Hydropower Project

Baramchi,Golche,Selang (Sindhupalchok)

  • Issue Date: 2017-03-29
  • Installed Capacity : 23.52MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Super Madi Hydropower Project

Namarjung,Parche,Saimrang,Kalika (Kaski)

  • Issue Date: 2017-03-30
  • Installed Capacity : 44MW
  • Phase : Under Construction
mai khola

Upper Chauri Khola Hydropower Project

Kabhrepalanchok

  • Issue Date: 2017-05-12
  • Installed Capacity : 6MW
  • Phase : Under Construction
mai khola

Tamakoshi V Hydropower Project

Lamabagar,Orang,Bulung,Laduk,Gauri Sankar (Dolakha)

The Tamakoshi-V Hydropower Project is located approximately 170 km north east of Kathmandu, the capital of Nepal and approximately 40 km away from the district headquarter of Dolkha District- Charikot Bazaar. The district head-quarter is connected with the capital by Arniko Highway upto Lamasangu which is approximately 90 km and by Lamasnagu – Jiri road which is approximately 40 km up to Charikot. A gravel road of about 33 km is available from Charikot to Singate Bazaar is recently upgraded for the construction of Upper Tamakoshi Project. The newly constructed road connecting Singate Bazaar and Lamabagar for the construction of Upper Tamakoshi HEP passes from the both powerhouse and the headwork sites of this project. This road is recently built. Apart from the powerhouse and headwork sites of this project location of the adit tunnel for the construction of the headrace tunnel is very close to the newly built road. Thus the access to the construction adit will also be easier. Hence, this project does not need access road. However; few kilometers of project road is to be constructed to reach surge tank site, adit tunnels at surge tank, adit tunnel for the underground powerhouse and some particular locations of the project before the construction of the project.
  • Issue Date: 2017-05-03
  • Installed Capacity : 87MW
  • Phase : Under Construction
  • Type : Cascade
mai khola

Lower Modi-II Cascade Hydropower Project

Chuwa,Shivalaya,Katuwa Chaupari (Parbat)

Lower Modi-2 Hydropower Project (10.5 MW) is being developed as the cascade project of the upstream Lower Modi-1 Hydropower project. The project is in its design phase. The energy generated from the project will be evacuated to the national grid by 3 km, 132 kv transmission line to existing Lower Modi-1 switchyard and then on common system to NEA Modi Substation at Dimuwa, Parbat. The connection agreement is concluded with NEA, and the PPA is in process. The Detailed Project Report (DPR) of the project is near to completion. The construction of the project is estimated to begin from early 2016.
  • Issue Date: 2017-05-23
  • Installed Capacity : 10.5MW
  • Phase : Under Construction
  • Type : Run-of-River (RoR), Cascade of Lower Modi-1
mai khola

Lower Chirkhuwa Hydropower Project

Mulpani,Nepaledada (Bhojpur)

  • Issue Date: 2017-06-15
  • Installed Capacity : 4.06MW
  • Phase : Under Construction
mai khola

Upper Syange Khola Small Hydropower Project

Taghring (Lamjung)

  • Issue Date: 2017-06-05
  • Installed Capacity : 2.4MW
  • Phase : Under Construction
mai khola

Middle Tamor Hydropower Project

Hangdeva,Khokling,Phurumbu,Sawadin (Taplejung)

  • Issue Date: 2017-06-05
  • Installed Capacity : 54MW
  • Phase : Under Construction
mai khola

Rudi Khola-B Hydropower Project

Mijuredada (Kaski) Pasagaun (Lamjung)

Rudi Khola - B Hydroelectric Project is a run-of-River (RoR) type project and is proposed to be developed by Bindhyabasini Hydropower Development Company Ltd., with an installed capacity of 6.6 MW with 300 m net head and 2.5 m3/s (cumec) design discharge at Q40%. This project is being developed in tandem with Rudi Khola - A Hydroelectric Project (8.8 MW) in cascade system.
  • Issue Date: 2017-06-09
  • Installed Capacity : 6.6MW
  • Phase : Live
  • Type : Run of River
mai khola

Lankhuwa Khola Hydropower Project

Dhupu (Sankhuwasabha)

  • Issue Date: 2017-07-12
  • Installed Capacity : 5MW
  • Phase : Under Construction
mai khola

Mewa Khola Hydropower project

Khamlung,Khokling,Lingtep,Liwang,Thukima (Taplejung)

  • Issue Date: 2017-07-30
  • Installed Capacity : 50MW
  • Phase : Under Construction