mai khola

Balephi A Hydropower Project

Baramchi,Golche,Pangtang (Sindhupalchok)

  • Issue Date: 2015-04-19
  • Installed Capacity : 10.6MW
  • Phase : Under Construction
mai khola

Upper Hewa Hydropower Project

Jaljala,Siddhapokhari (Sankhuwasabha)

Upper Hewa Khola Small Hydropower project is a run-of-river type of project located in Sankhuwasava district at Siddhapokhai and Jaljala VDCs between longitudes 87o20’45” to 87o22’30” and latitudes 27o19’34” to 27o20’55”, just upstream of existing & operational Hewa Khola Small Hydropower Project, 4.5MW which is successfully completed by Barun Hydropower Company Ltd. The same developers are going to construct this project with an installed capacity of 8.5 MW with 236.2 m net head and 4.2 m3/sec design discharge at Q40%. The catchment area is 66km2 including two collection streams Jhutre and Khakuwa Khola.
  • Issue Date: 2015-04-28
  • Installed Capacity : 8.5MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Suri Khola Hydropower Project

Chankhu (Dolakha)

  • Issue Date: 2015-06-07
  • Installed Capacity : 7MW
  • Phase : Under Construction
mai khola

Upper Modi A Hydropower Project

Lumle,Ghandruk (Kaski)

  • Issue Date: 2015-06-19
  • Installed Capacity : 42MW
  • Phase : Under Construction
mai khola

Rukum gad Hydropower Project

Kanda,Sobha (Rukum)

  • Issue Date: 2015-07-24
  • Installed Capacity : 5MW
  • Phase : Under Construction
mai khola

Ghar Khola Hydropower Project

Shikha (Myagdi)

GKHPP is run-off-the river (ROR) type hydropower project with an installed capacity of 14 MW (2 X 7MW) .The project has design discharge of 3.46 m3/s and net head of 480.33m that generates 78.498 GWh of energy annually. The proposed Headworks site lies at an elevation of 1645.0 m of GharKhola and the Powerhouse is located at an elevation of 1185 m, 300 m downstream of the confluence of Ghar Khola with Kaligandaki River. Project consists of about 3030 m of tunnel (Finished Dimension (2.4 m x 2.6 m). There is 57 m long Surge Pipe (Internal dia. 2.2m) followed by 1.2 m dia. 1281m long Penstock Pipe.
  • Issue Date: 2015-07-26
  • Installed Capacity : 14MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Jeuli Gad Hydropower Project

Chainpur,Rithapata (Bajhang)

  • Issue Date: 2015-07-07
  • Installed Capacity : 0.996MW
  • Phase : Under Construction
mai khola

Ghatte Khola Hydropower Project

Marbu (Dolakha)

  • Issue Date: 2015-07-09
  • Installed Capacity : 5MW
  • Phase : Under Construction
mai khola

Iwa Khola Hydropower Project

Sawalakhu (Taplejung)

  • Issue Date: 2015-07-13
  • Installed Capacity : 9.9MW
  • Phase : Live
mai khola

Tanchhahara Small Hydropower Project

Kowang,Lete (Mustang)

  • Issue Date: 2015-08-14
  • Installed Capacity : 2.4MW
  • Phase : Under Construction
mai khola

Langtang Khola Small Hydropower Project

Syafru (Rasuwa)

Located in the Rasuwa district (currently Gosainkunda Rural Municipality), Langtang Khola HEP is the second biggest project undertaken by RM Group, with a generation capacity of 20 MW. The rated head for this project is 195 m with a design discharge of 12 cumecs. The energy output in the dry season is 34.7 GWh and in the wet season is 98.6 GWh. The contract for construction has been signed with CWTW in EPC modality on May 5th, 2017.
  • Issue Date: 2015-09-18
  • Installed Capacity : 20MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Siddhi Khola Hydropower Project

Samalpung,Jirmale (Ilam)

  • Issue Date: 2015-09-30
  • Installed Capacity : 10MW
  • Phase : Under Construction