Hydropower Projects

mai khola

Nyadi Khola Hydropower Project

Bahundada,Bhulbhule (Lamjung)

  • Issue Date: 2013-02-14
  • Installed Capacity : 30MW
  • Phase : Under Construction
  • Type : 30
mai khola

Upper Jumdi Khola Hydropower Project

Juhang,Bharse,Hasara (Gulmi)

  • Issue Date: 2013-02-26
  • Installed Capacity : 0.995MW
  • Phase : Under Construction
mai khola

Lower Tadi Hydropower Project

Balkumari,Samundratar,Sundaradevi,Thaprek (Nuwakot)

  • Issue Date: 2013-04-08
  • Installed Capacity : 4.993MW
  • Phase : Under Construction
mai khola

Khorunga Khola Hydropower Project

Ambung,Oyabjung (Terhathum)

  • Issue Date: 2013-04-10
  • Installed Capacity : 4.8MW
  • Phase : Under Construction
mai khola

Gelun Khola Hydropower Project

Baramchi,Hagam,Jalbire (Sindhupalchok)

  • Issue Date: 2013-05-20
  • Installed Capacity : 3.2MW
  • Phase : Under Construction
mai khola

Khani Khola (Dolakha) Hydropower Project

Marbu,Khare (Dolakha)

  • Issue Date: 2013-05-24
  • Installed Capacity : 30MW
  • Phase : Under Construction
mai khola

Middle Modi

Deupurkot,Tilahar (Parbat)

Middle Modi Hydroelectric Project (15 MW) Middle Modi Hydroelectric Project (MMHP) is located about 40 km north-west of Pokhara in Kaski and Parbat Districts, Gandaki Zone of Western Development. The project lies in the Bhuktangle, Deupur and Tilhar VDCs of Parbat District and Salyan and Lumle VDCs of Kaski District. The headworks is located at Birethanti village. At present there is about 1.5km long earthen road access to the headworks area from Nayapul bazaar which is the nearest point with all year road access along the Pokhara – Baglung highway. The powerhouse lies opposite to the Pokhara – Baglung highway at the right bank of the Modi with waterway alignment located at the right bank of Modi Khola.
  • Issue Date: 2013-06-25
  • Installed Capacity : 15.1MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Dhunge - Jiri Hydropower Project

Jiri (Dolakha)

  • Issue Date: 2013-07-08
  • Installed Capacity : 0.6MW
  • Phase : Under Construction
mai khola

Kabeli B - 1 Hydropower Project

Nagi,Tharpu (Panchthar)

  • Issue Date: 2013-07-12
  • Installed Capacity : 25MW
  • Phase : Live
mai khola

Lower Hewa Hydropower Project

Bharapa,Nangeen,Phidim (Panchthar)

Lower Hewa Khola Hydropower Project (LHKHPP) (developed by Mountain Hydro Nepal Pvt. Ltd) is located in Panchthar District of Eastern Development Region of Nepal. The project is a run-of-river type in which water will be diverted from the Hewa Khola and the Pheme Khola just upstream of their confluence, by constructing concrete weir at hewa and boulder rip-rap at Pheme. The Combined design discharge of project is 14.838 m3/s with 40% probability of exceedance level will be diverted for power generation through the side intakes located at left banks of Hewa Khola and Pheme Khola respectively. This project utilizes a gross head of 178.09 m in between the intakes at an elevation of 636.09masl and tailwater level 458.00 masl. The total length of the waterways including intakes, approach canals, settling basins, headrace tunnel, penstock pipe and tailrace will be about 6039 m.
  • Issue Date: 2013-07-24
  • Installed Capacity : 21.6MW
  • Phase : Live
  • Type : Run of River
mai khola

Middle Midim Hydropower Project

,Gilung,Karapu,Maling,Nalma (Lamjung)

  • Issue Date: 2013-07-25
  • Installed Capacity : 3.1MW
  • Phase : Under Construction
mai khola

Upper Trishuli 3B Hydropower Project

Manakamana (Nuwakot)

  • Commercial Operation Date : 2018-11-01
  • Installed Capacity : 37MW
  • Phase : Under Construction
  • Type : Cascade project