Hydropower Projects

mai khola

Parajuli Khola-1 Hydropower Project

Awal Parajul (Dailekh)

  • Issue Date: 2013-08-19
  • Installed Capacity : 2.15MW
  • Phase : Under Construction
mai khola

Lohare Khola Hydropower Project

Baluwatar,Nomule,Salleri,Toli (Dailekh)

  • Issue Date: 2013-09-24
  • Installed Capacity : 4.2MW
  • Phase : Under Construction
mai khola

Salankhu Khola Hydropower Project

Kaule,Manakamana,Tupche,Fikuri (Nuwakot)

  • Issue Date: 2013-10-22
  • Installed Capacity : 2.5MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Madhya Bhotekoshi Hydropower Project

Maneswor,Marbin,Listi (Sindhupalchok)

Madhya Bhotekoshi Jalavidhyut Company Limited (MBJCL) is a subsidiary company of Chilime, registered as a public company in July 2010. MBJCL has planned to develop the Middle Bhotekoshi Hydroelectric Project (MBKHEP) with an installed capacity of 102 MW in the Sindhupalchowk district of the Central Development Region. A tri-partite loan agreement has been signed between EPF, Chilime and MBJCL for the debt portion. The equity investment will be made through 51% promoter share and 49% public share. Chilime is a leading company with a 38% share.
  • Commercial Operation Date : 2016-12-01
  • Installed Capacity : 102MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Rudi A Hydropower Project

Mijuredada (Kaski) Bhoje,Pasagaun (Lamjung)

  • Issue Date: 2013-12-27
  • Installed Capacity : 8.8MW
  • Phase : Live
  • Type : Run Of River
mai khola

Ghalemdi Khola Hydropower Project

Narchyang (Myagdi)

5 MW Ghalemdi Khola HEP is a run of river (RoR) project located in Ghalemdi River at Myagdi district of Western Nepal. The project has a catchment area of ~85 sq. km that is expected to support the design discharge of 3.50 cumecs at 41.40% exceedance flow. As per the terms of the PPA, the tariff for wet season is NPR 4.8 per kWhr and for dry season4 is NPR 8.4 per kWhr with 3% escalation on base tariff for five years for 4 MW capacity and for eight years for additional 1 MW capacity.
  • Issue Date: 2013-12-29
  • Installed Capacity : 5MW
  • Phase : Live
  • Type : Run of River
mai khola

Kapadigad Hydropower Project

Barchhen (Doti)

  • Issue Date: 2013-12-29
  • Installed Capacity : 3.3MW
  • Phase : Live
mai khola

Rawa Khola Hydropower Project

Hauchour,Jalapa,Dumekoldada (Khotang)

  • Issue Date: 2014-02-11
  • Installed Capacity : 6.5MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Down Piluwa Hydropower Project

Baneswor,Ankhibhui,Mamling (Sankhuwasabha)

  • Issue Date: 2014-02-16
  • Installed Capacity : 9.5MW
  • Phase : Under Construction
mai khola

Super Dordi Kha Hydropower Project

Dhodeni,Faleni (Lamjung)

  • Issue Date: 2014-03-05
  • Installed Capacity : 49.6MW
  • Phase : Under Construction
mai khola

Solu Hydropower Project

Gora Khami,Garma,Salleri (Solukhumbu)

The 23.5 MW project is a simple run off river scheme with 5.5m high, 26m long diversion weir, side intake, surface de-silting basin and pipe line (water conveyance system) of 3860m length and 2.5m diameter, inclined steel surge tank, surface penstock, surface powerhouse and tailrace canal. Design discharge is 12.26m3/sec and head of the project is 229.30m. Power produced will be sold to Nepal Electricity Authority.
  • Commercial Operation Date : 2020-03-23
  • Installed Capacity : 23.5MW
  • Phase : Live
  • Type : Run of River
mai khola

Lower Solu Hydropower Project

Garma,Tingla (Solukhumbu)

  • Issue Date: 2013-02-19
  • Installed Capacity : 82MW
  • Phase : Under Construction